BLD-Final | 6/14/2016 | 6/15/2016 | 6/15/2016 | A | PASS |
Jim Storey
|
|
|
Jarrod Phone #: ###-####
|
DOC - Permit Finaled | 6/15/2016 | 6/15/2016 | 6/15/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 6/6/2016 | 6/7/2016 | 6/7/2016 | A | NR |
Jim Storey
|
|
|
Jamal Phone #: ###-####
|
BLD-Final | 6/3/2016 | 6/3/2016 | 6/6/2016 | P | NR |
Jim Storey
|
|
|
Jared-ask for Jamal ###-#### Phone #: ###-####
|
FIRE-Final Inspection | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarm modifications, point of contact has fire extinguisher to put in fire extingiusher cabinet. Final life fire safety inspection passed/complete.
|
BLD-Final | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | NR |
Jim Sly
|
|
|
Jared Phone #: ###-#### Need Zoning, Fire Alarm and Fire/Life Finals.
|
BLD-Framing/Rough-in | 2/3/2016 | 2/5/2016 | 2/5/2016 | A | PART |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
BLD-Foundation | 12/10/2015 | 12/10/2015 | 12/10/2015 | P | NR |
Jim Sly
|
|
|
Rebar // Jamal Phone #: ###-#### Special insp. required.......No inspection performed. Footing pad to the North.....is not complete per plan......Foundation wall intersects footing and footing not big enough. Engineer to advise. Contractor to provide small docs which were not attached to plan.
|