BLD-Final | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | PASS |
Mike Jordan
|
|
|
Jake Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 8/27/2015 | 8/28/2015 | 8/28/2015 | A | PART |
Mike Jordan
|
|
|
Please call 30 min prior so we can meet. Temp CO per Jason Blais Phone #: ###-#### Inspection requested via web by Kyle Buzzell. OK for temp occ
|
BLD-Final | 8/21/2015 | 8/24/2015 | 8/24/2015 | P | NR |
Mike Jordan
|
|
|
Please call prior to inspection so we can be onsite. Thanks Phone #: ###-#### Inspection requested via web by Kyle Buzzell. Needs to have electrical, plumbing and electrical finals first.
|
BLD-Other | 8/21/2015 | 8/24/2015 | 8/24/2015 | A | PASS |
Mike Jordan
|
|
|
Tim-steel beam-please call to meet Phone #: ###-####. Reviewed engineering for owner supplied calcs and inspected the in place work per the engineering.
|
BLD-Conference | 7/2/2015 | 7/7/2015 | 7/7/2015 | A | DONE |
Mike Jordan
|
|
|
would like call ahead; Ron Phone #: ###-####. Discussed equipment issues and what is required to be submitted.
|
BLD-Final | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | PART |
Mike Jordan
|
|
|
Ron Phone #: ###-####. Called and left message for ron, will need additional engineering for both structures being installed inside of building.
|
FIRE-Final Inspection | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | CANC |
Troy Cobbley
|
|
|
Per Ron Phone #: ###-####
|
FIRE-Final Inspection | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | FAIL |
Troy Cobbley
|
|
|
Need the fire alarm permit finaled and the exit signs/emergency lights installed per the approved plans. Also need the single action hardware installed.
|