BLD-Final | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Mike Jordan
|
|
|
call for access; Jason Phone #: ###-####
|
DOC - Permit Finaled | 5/17/2016 | 5/17/2016 | 5/17/2016 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Address is on the free standing sign
|
BLD-Framing/Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | PASS |
Mike Jordan
|
|
|
Call for access - Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | PART |
Mike Jordan
|
|
|
Jason Phone #: ###-####. Framing ok. Needs to foam all penetrations in top plates. Correction notice posted.
|
BLD-Wall Bracing | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-#### OK to cover Ext.
|
BLD-Wall Bracing | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | NR |
Mike Jordan
|
|
|
Travis Phone #: ###-####. No one on site. called travis and left message noting that I was on my way. Waited at jobsite for approx. 45. min. No one on site except for stucco crew. Noted sheet rock cannot see the entirely assembly (WP 1330) I noted to travis that some sheetrock will need to removed to see aseembly. Will need to reschedule.
|
BLD-Wall Bracing | 11/13/2015 | 11/16/2015 | 11/16/2015 | A | NH |
Mike Jordan
|
|
|
Travis Phone #: ###-####. No access to jobsite. No one here, gate locked. RESCHEDULED A PM INSPECTION.
|
BLD-Wall Bracing | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | NR |
Mike Jordan
|
|
|
Travis Phone #: ###-####. New details for exterior 1hr. walls not yet submitted and approved. Called to advise travis on what he needs to do.
|
BLD-Wall Bracing | 11/5/2015 | 11/9/2015 | 11/9/2015 | A | FAIL |
Mike Jordan
|
|
|
Travis Phone #: ###-####. Detail procided by architect only provides 1hr. from the exterior side, 1hr. is required from both sides of exterior wall. Plan design shows that the parapet is to be constructed 2x framing to provide the required 1hr. construction on either side. in place construction used jack truss to provide parapet construction. Called travis to advise him of non compliance. Also spoke with plan review (Tim W. ) to discuss the non compliance. Architect and contractor to resubmit to plan review to show design change and details of an approved assembly to show compliance with the approved plans.
|
BLD-Wall Bracing | 11/4/2015 | 11/5/2015 | 11/4/2015 | A | CANC |
Mike Jordan
|
|
|
Travis Phone #: ###-#### **CANCELED by contractor***
|
BLD-Wall Bracing | 10/29/2015 | 11/2/2015 | 11/2/2015 | A | FAIL |
Mike Jordan
|
|
|
Travis Phone #: ###-####.. North and south wall shaer walls ok. Did note however that east and west walls are one construction to to proximity to property lines. Contractor to provide 1hr. construction on east and west walls per approved plan. Provide approved detail from architect showing the paprpet rating as well as soffitt? A correction notice was issued
|
BLD-Energy code compliance | 10/1/2015 | 10/1/2015 | 10/2/2015 | P | PART |
Jim Sly
|
|
|
Rob Phone #: ###-#### Foundation Insulation OK
|
BLD-Footing | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | CANC |
Mike Jordan
|
|
|
Travis Phone #: ###-####
|
BLD-Footing | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
Travis Phone #: ###-####
|