BLD-Foundation | 7/8/2015 | 7/8/2015 | 7/8/2015 | P | DONE |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Wall cover | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PART |
Tony Young
|
|
|
John Phone #: ###-####,, garage front has no room as the plan denotes,, all other brace panels and hold downs per plan
|
BLD-Footing | 7/6/2015 | 7/6/2015 | 7/6/2015 | P | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Conference | 6/11/2015 | 6/11/2015 | 6/11/2015 | A | PASS |
Bob Archibald
|
|
|
Conference with Larry Sundell (architect) on scope of work required for garage upgrade. Footings, hold downs and wall bracing upgrade will be required. All work will be performed on interior of structure.
|