BLD-Aging Inspection | 5/22/2020 | 5/22/2020 | 5/22/2020 | | CANC |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 5/21/2020 | 5/21/2020 | 5/22/2020 | | PEND |
Tell Riley
|
|
|
no activity//
|
BLD-Framing/Rough-in | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PART |
Brandon Shaw
|
|
|
Up stairs laundry room, Ok to cover, pending mech approval...
|
BLD-Conference | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | DONE |
Bob Archibald
|
|
|
Phone conference with Shawn informing him that permit could be reactivated with original approved plans and for 1/2 permit original fee. As only a footing inspection was performed all required code inspections must be verified/performed and trade inspections passed (stud framing must be visible).
|
BLD-Conference | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | DONE |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Conference | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | DONE |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Conference | 1/12/2016 | 1/12/2016 | 1/12/2016 | P | DONE |
Jim Sly
|
|
|
Shawn Phone #: ###-####
|
BLD-Foundation | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Jim Sly
|
|
|
Please call ahead for access - Shawn Phone #: ###-####
|
BLD-Conference | 1/6/2016 | 1/7/2016 | 1/7/2016 | A | PASS |
Jim Sly
|
|
|
Shawn Phone #: ###-#### OK to pour footing for Kitchen extension.
|