BLD-Final | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Jim Sly
|
|
|
Quinton Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. FIre pump and building expansion covered under new permits
Quentin Phone #: ###-####
|
BLD-Final | 12/1/2017 | 12/1/2017 | 12/3/2017 | P | PEND |
Jim Sly
|
|
|
See Fire.........
|
BLD-Aging Inspection | 9/6/2017 | 9/6/2017 | 9/14/2017 | | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 5/9/2017 | 5/9/2017 | 5/9/2017 | | CANC |
Jim Sly
|
|
|
|
FIRE-Conference | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | DONE |
Troy Cobbley
|
|
|
Per Assistant Chief Ron Johnson the Temporary Occupancy is to continue until directed otherwise. Included is the email dated 8/15/16 giving current status.
From: Ronald Johnson Sent: Monday, August 15, 2016 10:04 AM To: Quinton Boyer Cc: Tom Easton ; Randy Bowron ; Mike Bierman ; Tim Frost ; Scott Arellano ; Romeo Gervais Subject: Fire Flow for Larry Miller Subaru
Mr. Boyer,
I met Suez Water field techs last week to witness a flow test at the fire hydrant at the northwest corner of Larry Miller Subaru. The results of the flow test are as follows.
Outlet: 4.5”, Discharge Coefficient .9
Static: 57
Pitot: 26
Residual: 45
Actual Flow: 2772 gpm
Flow at 20psi: 5092 gpm
The available fire flow as calculated using the flow test does not support a properly functioning fire sprinkler system as designed. I discussed these results with Suez and inquired if there would be any stability increase in the system in the near future. There are no plans for any improvements that would stabilize or increase the pressure in this area in the foreseeable future. Unfortunately, the sprinkler system for Larry Miller Subaru was designed using a fire flow that does not reflect the significant daily drop in pressure. This daily drop in pressure lasts several hours and is expected to occur at least 3.5 to 4 months of the year. If a fire were to occur in the building, the sprinkler system may not be sufficient to keep it in check or extinguish the fire during several hours of the day. I know this is very inconvenient and will likely be expensive to resolve, so I am open to a reasonable timeline for repairs. Please respond with a plan and proposed timeline. I am willing to discuss this and answer questions you and the owner may have by phone or in person. Would you mind forwarding owner contact information to me so I can contact them?
Regards,
cid:image001.jpg@01CE20C9.F3E72450 Ron Johnson
Division Chief – Assistant Fire Marshal
|
FIRE-Conference | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | DONE |
Troy Cobbley
|
|
|
60 psi on the guage this morning
|
FIRE-Conference | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | DONE |
Troy Cobbley
|
|
|
Pressure was 64psi this morning
|
FIRE-Conference | 7/6/2016 | 7/6/2016 | 7/6/2016 | A | DONE |
Troy Cobbley
|
|
|
Pressure was 62psi this morning
|
FIRE-Conference | 7/5/2016 | 7/5/2016 | 7/5/2016 | A | DONE |
Troy Cobbley
|
|
|
Reading on the guage this morning was 70psi
|
FIRE-Conference | 7/1/2016 | 7/1/2016 | 7/1/2016 | A | DONE |
Troy Cobbley
|
|
|
57psi on the guage this morning
|
FIRE-Conference | 6/30/2016 | 6/30/2016 | 6/30/2016 | A | DONE |
Troy Cobbley
|
|
|
Pressure this morning was 69psi
|
FIRE-Conference | 6/29/2016 | 6/29/2016 | 6/29/2016 | A | DONE |
Troy Cobbley
|
|
|
57psi on the guage at 7:00 am this morning
|
FIRE-Conference | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | DONE |
Troy Cobbley
|
|
|
I witnessed 64psi at the base of riser.
|
FIRE-Conference | 6/28/2016 | 6/28/2016 | 6/28/2016 | A | DONE |
Troy Cobbley
|
|
|
This inspection actually occured on 6/27/16 where I witnessed pressure at the base of riser at 59psi
|
BLD-Final | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PART |
Jim Sly
|
|
|
Quinton Phone #: ###-#### OK For Temp. Occ. OK for Perm Occ. when ACHD, Electrical, Mechanical, and the Three fire inspections are finaled.
|
BLD-Final | 6/8/2016 | 6/8/2016 | 6/8/2016 | A | PART |
Troy Cobbley
|
|
|
Per the Fire Marshal, a TCO can be issued for the building permit (BLD15-01869) for the next 30 days. The static pressure at the base of the fire riser will need to be monitored and recorded over the next 30 days by the general contractor. These readings will be evaluated by the Fire Marshal at the end of the 30 days to determine if fire sprinkler system design changes will be necessary under (FIR15-00822) to accommodate the actual water supply available onsite.
|
BLD-Final | 6/2/2016 | 6/3/2016 | 6/3/2016 | A | NR |
Jim Sly
|
|
|
Temp Final - Quinton Phone #: ###-####
|
FIRE-Final Inspection | 6/2/2016 | 6/3/2016 | 6/3/2016 | A | PART |
Troy Cobbley
|
|
|
Temp 30 day Final - Quinton Phone #: ###-####
|
FIRE-Final Inspection | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire sprinkler permit finaled prior to a life safety final being given. All other life safety items have been addressed.
|
BLD-Final | 6/1/2016 | 6/2/2016 | 6/2/2016 | P | CANC |
Jim Sly
|
|
|
Layton Phone #: ###-####
|
FIRE-Conference | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | DONE |
Troy Cobbley
|
|
|
For a final sign off the project related fire alarm and fire sprinkler permits need addressed. Fire alarm plans need resubmitted and notification tested. Fire sprinkler forward flow is only proving half of the required water for the system. For life safety the signage needs to be provided as discussed for the Oil Storage room.
|
BLD-Final | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | CANC |
Jim Sly
|
|
|
Cancele per Clayton Phone #: ###-####
|
FIRE-Final Inspection | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection I verified that the exit signs and emergency lights have been repaired/completed
|
FIRE-Final Inspection | 5/20/2016 | 5/24/2016 | 5/24/2016 | P | CANC |
Troy Cobbley
|
|
|
Clinton Phone #: ###-####
|
FIRE-Conference | 5/23/2016 | 5/23/2016 | 5/23/2016 | P | DONE |
Troy Cobbley
|
|
|
I performed a life safety inspection. I noted exit signs and emergency lights that are non functional, not all fire extinguishers are mounted and not all of the door hardware is installed. Emergency lights are missing at the east end of the show room, three thumbturn dead bolts need to be removed from office doors, address numbers on three sides of the building need installed, signage at facp/riser and electrical rooms needs installed.
|
FIRE-Conference | 4/29/2016 | 5/11/2016 | 5/11/2016 | A | DONE |
Troy Cobbley
|
|
|
Quinon and I went over general life safety requirements
|
FIRE-Conference | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | DONE |
Troy Cobbley
|
|
|
The project superintendant and I spoke about general life safety requirements and he provided documentation that the wood sheating that had been installed above the showroom windows was fire treated.
|
BLD-Ceiling Grid Inspection | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Jim Sly
|
|
|
CLINTON Phone #: ###-####
|
BLD-Energy code compliance | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | PASS |
Jim Sly
|
|
|
Insulation // Clinton Phone #: ###-####
|
BLD-Framing/Rough-in | 3/17/2016 | 3/18/2016 | 3/18/2016 | A | PASS |
Jim Sly
|
|
|
Clinton Phone #: ###-####
|
BLD-Framing/Rough-in | 3/14/2016 | 3/15/2016 | 3/15/2016 | A | PART |
Jim Sly
|
|
|
Interior only, showroom - Quinton Phone #: ###-#### Everything except restrooms ......OK.
|
BLD-Framing/Rough-in | 2/29/2016 | 2/29/2016 | 2/29/2016 | P | PART |
Jim Sly
|
|
|
Quiton-partial-exterior farming on radius wall Phone #: ###-#### Front radius soffit .....OK.
|
BLD-Foundation | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PART |
Jim Sly
|
|
|
Quintin Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Concrete | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PART |
Jim Sly
|
|
|
service area; Quintin Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Other | 12/1/2015 | 12/3/2015 | 12/3/2015 | P | PART |
Jim Sly
|
|
|
masonary grout pour (12ft lift on east side, 16ft lift west side), reinforced slab (showroom side slab area C ) - Clinton Phone #: ###-#### OK pending MTI specvial insp, tests and approvals.
|
BLD-Foundation | 11/23/2015 | 11/25/2015 | 11/25/2015 | A | PEND |
Dave Hannah
|
|
|
concrete pour, showroom ; Quintin Phone #: ###-####
|
BLD-Foundation | 11/23/2015 | 11/24/2015 | 11/24/2015 | P | PART |
Jim Sly
|
|
|
grout, service side - 12'' tall lift ; Quintin Phone #: ###-#### MTI on site.
|
DOC - Permit Finaled | 11/24/2015 | 11/24/2015 | 11/24/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Foundation | 11/23/2015 | 11/23/2015 | 11/23/2015 | P | PART |
Jim Sly
|
|
|
grout, service side - 8'' tall lift ; Quintin Phone #: ###-#### MTI on site.
|
BLD-Foundation | 11/19/2015 | 11/20/2015 | 11/20/2015 | A | PART |
Jim Sly
|
|
|
rebar; Quintin Phone #: ###-#### MTI on site.
|
BLD-Concrete | 11/2/2015 | 11/3/2015 | 11/4/2015 | P | PART |
Jim Sly
|
|
|
showroom side, Grout, 2pm pour; Quintin Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 10/28/2015 | 10/29/2015 | 10/29/2015 | A | PASS |
Jim Sly
|
|
|
exterior footing for showroom side (south side)Pouring at 3 - Quinton Phone #: ###-#### OK pending MTI special insp, tests and approvals.
|
BLD-Foundation | 10/27/2015 | 10/27/2015 | 10/27/2015 | P | PART |
Mike Jordan
|
|
|
Quinten-as late as possible wants to pour at 7:00 AM tomorrow-interior footing on north side of the project Phone #: ###-####. INterior footings for service bay area. Work in progress, pending special inspection.
|
BLD-Foundation | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PART |
Jim Sly
|
|
|
Quinten Phone #: ###-#### Grid line 3 and Int pads North of. OK pending MTI special inspections, tests and approvals.
|
BLD-Conference | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | DONE |
Jim Sly
|
|
|
Please call ahead to meet - Clinton Phone #: ###-####
|