Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD15-01964
StatusFinaled
Name HC COMPANY INC
Site Address 139 S BROADWAY AVE
Project Name139 Broadway South Building
Customer NumberBLD15-01965
ePlanReviewYes
Description
(139 BROADWAY – Shell and Core – South Bldg) Permit is to remodel an existing 6,249 square foot building. Remodel consists of a complete exterior façade remodel including new soffits and storefront. Scope of work includes: interior demolition, new mechanical, new plumbing, new electrical, installation of a new sprinkler system, exterior soffits, new storefronts, remodel one restroom to become fully accessible (the other restrooms will be remodeled with tenant improvements), and interior finishes. At the competition of this project the building will be Fully Fire Sprinklered. NOTE: Separate Building Permits are required prior to occupying this space. No tenant improvement permits will be issued until non-build agreement is recorded and approved by the City of Boise Legal Dept. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/25/20161/25/20161/25/2016PPASS
DetailsDave Hannah
Chris Phone #: ###-####
DOC - Permit Finaled  1/25/2016 DONE
BLD-Final11/19/201511/20/201511/20/2015PPART
DetailsJim Storey
Temporary
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman restaroom not complet/ pw on temp.
FIRE-Final Inspection11/19/201511/20/201511/20/2015APASS
DetailsJim Page
Fire sprinkler inspection for core/shell complete, fire alarm inspection for core/shell complete. Life fire safety inspection passed/complete.
BLD-Conference11/12/201511/12/201511/12/2015PDONE
DetailsDave Hannah
Call in route to meet there // Chris Phone #: ###-####
BLD-Framing/Rough-in10/8/201510/8/201510/8/2015APASS
DetailsDave Hannah
Please call Chris when in route Phone #: ###-#### Inspection requested via web by Chris Fuhrman
BLD-Framing/Rough-in10/1/201510/2/201510/6/2015PPASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Energy code compliance10/5/201510/5/201510/6/2015PPASS
DetailsDave Hannah
Chris// please call before Phone #: ###-####
BLD-Framing/Rough-in9/15/20159/16/20159/16/2015APASS
DetailsJim Storey
would like call ahead; Chris Phone #: ###-#### front sheer and steel stud framing ok fire treated ply in place south east frame out
BLD-Framing/Rough-in8/24/20158/25/20158/25/2015APART
DetailsDave Hannah
would like call ahead; Chris Phone #: ###-#### shear wall ok to cover