BLD-Final | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Jim Storey
|
|
|
Aaron Goodfellow Phone #: ###-#### final ok no card on site
|
BLD-Final | 11/29/2017 | 12/1/2017 | 12/1/2017 | A | PEND |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Repair door hardware on exit door.
|
BLD-Final | 7/20/2015 | 7/20/2015 | 7/20/2015 | P | PART |
Mike Jordan
|
|
|
Chris-please call 10 minutes prior fr access Phone #: ###-####. Ok for temp occ.
|
FIRE-Final Inspection | 7/16/2015 | 7/20/2015 | 7/20/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. New doors and hardware for warehouse #4 and #5 to be installed prior to building inspection. Scott and I discussed the racking in warehouse #4 and found there is no IFC requirement to address it since it does not exceed 500 sq. ft. I let the contractor know that seismic requirements still apply and would need to be addressed prior to a building inspection.
|
BLD-Final | 7/2/2015 | 7/6/2015 | 7/6/2015 | P | NR |
Tony Young
|
|
|
Chris-pleae call at least 10 minutes prior to meet Phone #: ###-####
|
FIRE-Final Inspection | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | FAIL |
Troy Cobbley
|
|
|
Repair exit sign/emergency light at the front exit door, provide tagged fire extinguishers mounted as discussed, repair or remove existing emergency lights, provide exit signs/emerency lights as shown on the approved plans, provide single action hardware on the warehouse #4 and #5 exit doors, provide racking permit for the high piled storage/racks in warehouse #4.
|