BLD-Final | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
Mike Jordan
|
|
|
Joe or ###-#### Stacey-please call for access Phone #: ###-####. All issues were resolved. Ok for perm. occ. No card on site to sign.
|
BLD-Final | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | NH |
Mike Jordan
|
|
|
Ryan or ###-#### Joe Phone #: ###-####. No access.
|
FIRE-Final Inspection | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Sticker at exit not installed yet
|
BLD-Conference | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | DONE |
Mike Jordan
|
|
|
Brian or ###-#### Joe Phone #: ###-####. Walk through with owner. Needs to remove thumb turn from main exit/enterance door, provide code compliant threshold at main door. Wall that was built not on plans is being removed along with non compliant doublr door that was installed. Also provide transition from carpet to tile.
|
BLD-Final | 7/17/2017 | 7/18/2017 | 7/18/2017 | P | CANC |
Mike Jordan
|
|
|
Call for access code - Ryan Phone #: ###-####
|
FIRE-Final Inspection | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide address, repair the exit discharge light, remove the thumbturn lock from the exit door (keyed,sticker,indicator ok), resubmit plans showing the revised wall layout and get plan review approval for non-ADA hardware and threshold height.
|
BLD-Energy code compliance | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PART |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Provide truss engineering. ok to insulate.
|
BLD-Energy code compliance | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | CANC |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | NH |
Mike Jordan
|
|
|
Joe Phone #: ###-####. No access. Door locked. Caleed Joe, no awnser, left message.
|
BLD-Energy code compliance | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | CANC |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Foundation | 10/22/2015 | 10/23/2015 | 10/23/2015 | P | PASS |
Mike Jordan
|
|
|
Nate Phone #: ###-####
|
BLD-Footing | 10/19/2015 | 10/19/2015 | 10/19/2015 | P | PASS |
Mike Jordan
|
|
|
After 2 // Nate Phone #: ###-####
|
BLD-Footing | 10/14/2015 | 10/15/2015 | 10/15/2015 | A | FAIL |
Mike Jordan
|
|
|
Nate Phone #: ###-####. no reinforcement. Approve plans shows reinforcent in footings.
|