BLD-Final | 3/7/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Wall cover | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for shaft covering in trash room level 1. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|
BLD-Energy code compliance | 10/31/2017 | 11/1/2017 | 11/1/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Fire Caulking at the 1st and 2nd floors. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Other | 10/17/2017 | 10/18/2017 | 10/18/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for drop ceiling cover. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Other | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | PEND |
Dave Hannah
|
|
|
Inspection request for the vehicle Cable Barrier sign off. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Wall cover | 10/10/2017 | 10/11/2017 | 10/10/2017 | A | CANC |
Dave Hannah
|
|
|
Inspection request for the soffit sheetrock at the 3rd floor. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin Inspection cancelled from web by: Carl Benjamin
|
BLD-Conference | 10/4/2017 | 10/5/2017 | 10/5/2017 | A | PEND |
Dave Hannah
|
|
|
Inspection request for vehicle barrier cable code compliance in the parking garage. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
|
BLD-Energy code compliance | 8/11/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Insulation Barrier at the 4th floor of Tower A and 3rd Floor of Tower B. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 8/3/2017 | 8/4/2017 | 8/4/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for duct chases. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Other | 8/1/2017 | 8/2/2017 | 8/3/2017 | A | NR |
Dave Hannah
|
|
|
Inspection request for the base of the 2 hour shaft assemblies. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Other | 7/26/2017 | 7/27/2017 | 7/28/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection request for Intumescent Paint at the Live Works Unit Columns per ASI 81 and Structural Shaft at Unit 725. Thank you. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | PART |
Dave Hannah
|
|
|
Inspection request for the structural wall framing where the plumbing compromised the structural integrity at multiple areas. Reference RFI #300 Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Energy code compliance | 7/13/2017 | 7/14/2017 | 7/14/2017 | A | PART |
Dave Hannah
|
|
|
Inspection request is for the 4th floor of Tower B. Fire Caulking. Phone #: ###-#### Inspection requested via web by Carl Benjamin ok to insulate but the plumbing walls the studs have been over cut on some walls needs engineer to ok
|
BLD-Aging Inspection | 7/7/2017 | 7/7/2017 | 7/7/2017 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | DONE |
Dave Hannah
|
|
|
Inspection request for Live Works Area 2hr rated walls Conference Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Conference | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
BLD-Framing/Rough-in | 2/22/2017 | 2/22/2017 | 2/23/2017 | P | PART |
Dave Hannah
|
|
|
Chris Phone #: ###-#### ext framing first and second floor ok to cover ext.
|
BLD-Conference | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Conference | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Conference | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | DONE |
Dave Hannah
|
|
|
Chris Phone #: ###-#### talked about sprinklers in roof
|
BLD-Foundation | 4/5/2016 | 4/8/2016 | 4/9/2016 | P | PEND |
Dave Hannah
|
|
|
Rebar // Chris Phone #: ###-####
|
BLD-Foundation | 4/5/2016 | 4/6/2016 | 4/7/2016 | P | PEND |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Foundation | 4/5/2016 | 4/5/2016 | 4/7/2016 | P | PEND |
Dave Hannah
|
|
|
Chris-Rebar Phone #: ###-####
|
BLD-Foundation | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PEND |
Dave Hannah
|
|
|
Rebar // Chris Phone #: ###-#### on site 2;30 crews are placing walls and one grade beam mti will do final inspection of rebar
|
BLD-Conference | 3/28/2016 | 3/29/2016 | 3/30/2016 | A | PART |
Dave Hannah
|
|
|
Inspection ow wall rebar and column rebar--Pour at 2pm MTI also will be here to inspect Phone #: ###-#### Inspection requested via web by Tom Hayes
|
BLD-Foundation | 3/25/2016 | 3/28/2016 | 3/29/2016 | A | PART |
Dave Hannah
|
|
|
Chris-rebar Phone #: ###-#### column pads elev. foundation spec inspecion will do final and pull concrete test cyl.
|
BLD-Conference | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PART |
Mike Jordan
|
|
|
Wall and footing rebar inspection am. Concrete pour at 1 pm Contact Tom Hayes with Andersen Construction for any questions, phone number is listed above Phone #: ###-#### Inspection requested via web by Tom Hayes. Work in progress, pend. special inspection.
|
BLD-Conference | 3/9/2016 | 3/10/2016 | 3/10/2016 | A | PASS |
Dave Hannah
|
|
|
Footing Rebar inspections Grids 2-9 and B-H Note:: Pouring real early today, Dave Hannah Looked at Wednesday afternoon Contact: Tom Hayes Phone #: ###-#### Inspection requested via web by Tom Hayes
|
BLD-Conference | 2/25/2016 | 3/1/2016 | 3/1/2016 | A | DONE |
Dave Hannah
|
|
|
Duel Phone #: ###-####
|