BLD-Final | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
DOC - Permit Finaled | 2/1/2016 | 2/1/2016 | 2/1/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 1/29/2016 | 1/29/2016 | 1/29/2016 | P | CANC |
Mike Jordan
|
|
|
Josh-please call 30 minutes prior to meet Phone #: ###-####
|
BLD-Final | 1/26/2016 | 1/27/2016 | 1/27/2016 | P | NR |
Mike Jordan
|
|
|
Josh Phone #: ###-####. Adress not posted, exterior wall weather envelope not completed. No access, but noted that spindels at stairway for guards not completed. No further inspection was completed.
|
BLD-Energy code compliance | 11/6/2015 | 11/9/2015 | 11/9/2015 | A | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 11/6/2015 | 11/9/2015 | 11/9/2015 | A | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 11/4/2015 | 11/4/2015 | 11/4/2015 | P | FAIL |
Mike Jordan
|
|
|
Call when on your way to meet // Josh Phone #: ###-####. Complete lateralbracing on T12 trusses, nail off 2ply T22 and T25 trusses per the engineering. The 6x6 post by the furnance requires full bearing to the foundation system.
|
BLD-Framing/Rough-in | 10/30/2015 | 11/2/2015 | 11/2/2015 | P | NR |
Mike Jordan
|
|
|
Josh Phone #: ###-####. Mech. and electrical roough in inspection haver failed.
|
BLD-Wall cover | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Mike Jordan
|
|
|
Shear // Josh Phone #: ###-####
|
BLD-Wall Bracing | 10/21/2015 | 10/21/2015 | 10/21/2015 | P | FAIL |
Mike Jordan
|
|
|
Josh Phone #: ###-####. Remove tyvek for wall bracing inspection.
|
BLD-Foundation | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Mike Jordan
|
|
|
J.R. Phone #: ###-####
|
BLD-Footing | 9/17/2015 | 9/18/2015 | 9/18/2015 | P | PART |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|