BLD-Final | 10/1/2015 | 10/2/2015 | 10/2/2015 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Snow
|
BLD-Final | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Snow
|
DOC - Permit Finaled | 10/2/2015 | 10/2/2015 | 10/2/2015 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 10/1/2015 | 10/2/2015 | 10/2/2015 | A | PASS |
Troy Cobbley
|
|
|
Fire Life Safety Passed
|
FIRE-Final Inspection | 9/30/2015 | 10/1/2015 | 10/1/2015 | A | CANC |
Troy Cobbley
|
|
|
Could not do life safety until the project related fire sprinkler permit is complete.
|
BLD-Conference | 9/23/2015 | 9/23/2015 | 9/23/2015 | P | PASS |
Mike Jordan
|
|
|
Exterior Framing Phone #: ###-#### Inspection requested via web by Robert Snow. Contractor has installed the coorect clips per plan on new store front. Ok to cover.
|
BLD-Conference | 9/21/2015 | 9/22/2015 | 9/22/2015 | A | FAIL |
Mike Jordan
|
|
|
Exterior framing Phone #: ###-#### Inspection requested via web by Robert Snow. Provide the correct clips per the plan or RFI from engineer specifing that cut metal stud is sufficient.
|
BLD-Framing/Rough-in | 9/18/2015 | 9/18/2015 | 9/18/2015 | A | PASS |
Mike Jordan
|
|
|
Customer service walls Phone #: ###-#### Inspection requested via web by Robert Snow
|
BLD-Framing/Rough-in | 9/15/2015 | 9/15/2015 | 9/15/2015 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Snow. Interior steel stud wall in fitting room area ok.
|
BLD-Framing/Rough-in | 8/27/2015 | 8/27/2015 | 8/27/2015 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Snow. INterior steel stud framed walls for cafeteria remodel.
|
BLD-Concrete | 8/16/2015 | 8/17/2015 | 8/17/2015 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Snow. #3 rebar in trenced area at slab in the jewlery section of store. ok.
|