BLD-Final | 9/28/2015 | 9/29/2015 | 9/29/2015 | P | DONE |
Tony Young
|
|
|
Kurt Phone #: ###-####,, ok for c of o
|
FIRE-Final Inspection | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
BLD-Final | 9/28/2015 | 9/28/2015 | 9/29/2015 | P | DONE |
Tony Young
|
|
|
Phone #: ###-####,, ok pending fire full pass,,, per 425
|
BLD-Final | 9/9/2015 | 9/9/2015 | 9/9/2015 | P | PART |
Dave Hannah
|
|
|
Kurt Phone #: ###-#### ok for temp occ ok for perm occ after fire finals
|
FIRE-Final Inspection | 9/8/2015 | 9/8/2015 | 9/8/2015 | P | PART |
Jim Page
|
|
|
Previously noted items addressed/repaired, current active fire alarm system is in service, not in alarm (previous inspection FACP was in alarm) at time of inspection, emergency egress light installed at southwest emergency exit. Final fire alarm system/FIR permit will be inspected at later date.
|
FIRE-Final Inspection | 8/26/2015 | 8/27/2015 | 8/27/2015 | A | FAIL |
Jim Page
|
|
|
No FIR permit associated with this project at time of inspection, specified in Plan Review notes that a fire alarm permit will be required for project. The fire alarm panel was in alarm at time of inspection, repairs/modifications/additions to current fire alarm system are required, informed POC Lori, phone ###-#### to contact a fire alarm contractor to have system updated/repaired before life fire safety can be completed. Egress discharge area located on west side did not have exterior egress illumination, needs to be corrected before next inspection.
|
BLD-Conference | 8/26/2015 | 8/26/2015 | 8/27/2015 | P | PART |
Tony Young
|
|
|
door ?s,, thresh hold needs to be within code
|
BLD-Framing/Rough-in | 8/18/2015 | 8/19/2015 | 8/19/2015 | A | PASS |
Tony Young
|
|
|
Kurt Phone #: ###-####
|