BLD-Final | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Jim Sly
|
|
|
Kevin Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PART |
Dave Hannah
|
|
|
Kevin Phone #: ###-#### ok to occ the office area
|
BLD-Other | 4/28/2016 | 4/28/2016 | 4/29/2016 | P | DONE |
Dave Hannah
|
|
|
Hand rail // Kevin Phone #: ###-####
|
BLD-Conference | 4/29/2016 | 4/29/2016 | 4/29/2016 | A | PART |
Dave Hannah
|
|
|
Hand rail // Kevin Phone #: ###-#### ok to use mezzanine
|
BLD-Final | 4/21/2016 | 4/22/2016 | 4/25/2016 | P | PART |
Dave Hannah
|
|
|
Kevin Phone #: ###-#### need PW inspection ok for temp occ tasting rm
|
FIRE-Final Inspection | 4/21/2016 | 4/22/2016 | 4/22/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with curent inspection tags. Signage for fire sprinkler riser room to be installed before final building inspection. Final life fire safety inspection passed/complete.
|
BLD-Conference | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | DONE |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 2/29/2016 | 3/1/2016 | 3/1/2016 | A | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####ext soffits
|
BLD-Framing/Rough-in | 2/18/2016 | 2/19/2016 | 2/19/2016 | A | PASS |
Dave Hannah
|
|
|
Kevin-tasting room Phone #: ###-####
|
BLD-Framing/Rough-in | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PART |
Mike Jordan
|
|
|
Ceiling // Kevin Phone #: ###-####. Provide detail for hardlids.
|
BLD-Framing/Rough-in | 1/14/2016 | 1/14/2016 | 1/15/2016 | P | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|