BLD-Final | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | PASS |
Jim Storey
|
|
|
JIm, give me a call before or when you get to the job. My cell is ###-#### Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
DOC - Permit Finaled | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | DEFR |
Jim Storey
|
|
|
JIm, give me a call before or when you get to the job. My cell is ###-#### Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Conference | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | DEFR |
Jim Storey
|
|
|
JIm, give me a call before or when you get to the job. My cell is ###-#### Thanks, Kent Phone #: ###-#### Inspection requested via web by Kent Mortensen out of time rolled to am
|
BLD-Final | 4/26/2016 | 4/27/2016 | 4/27/2016 | P | FAIL |
Jim Storey
|
|
|
call Dave for Garage Door code ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen handrail continous nose to nose top run/ min 4 inches open at risers. all the rest of house ok
|
BLD-Grading Inspection | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | NR |
Jim Storey
|
|
|
Final is scheduled for this afternoon. I had talked with someone last week who went out after receiving the letter from our soils engineer last week. They told me that they would be out again Tuesday afternoon to reinspect after we had the street clean and the BMP removed from the gutter drain. I did not know if I needed to order this inspection as well for this afternoon since he had told me he was going out today. Thanks, Kent Mortensen. Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Final | 4/26/2016 | 4/26/2016 | 4/26/2016 | P | NR |
Jim Storey
|
|
|
call Dave for Garage Door code ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Energy code compliance | 2/22/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Jim Storey
|
|
|
Dave''s Cell ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Framing/Rough-in | 2/18/2016 | 2/19/2016 | 2/19/2016 | P | PART |
Jim Storey
|
|
|
Dave''s cell is ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen fire blk ceilling at fireplace/ blk garage pannel
|
BLD-Framing/Rough-in | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | NR |
Jim Sly
|
|
|
Dave''s cell is ###-#### if you have any questions or want to meet him there. Phone #: ###-#### Inspection requested via web by Kent Mortensen No Mech pressure test or Rough-in approval. No inspection performed.
|
BLD-Wall Bracing | 1/29/2016 | 2/1/2016 | 2/1/2016 | A | PART |
Jim Storey
|
|
|
Dave''s cell ph ###-#### Phone #: ###-#### Inspection requested via web by Kent Mortensen engineering change pending 16 oc to 24/
|
BLD-Foundation | 1/7/2016 | 1/8/2016 | 1/8/2016 | A | PASS |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 1/6/2016 | 1/7/2016 | 1/7/2016 | P | PASS |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 1/5/2016 | 1/6/2016 | 1/6/2016 | A | CANC |
Phil Shearer
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 12/14/2015 | 12/14/2015 | 12/14/2015 | P | PART |
Tony Young
|
|
|
Wall // Mana Phone #: ###-####,, work in progress,, will pour 12/15
|
BLD-Footing | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PASS |
Jim Storey
|
|
|
Foundation Contractor - Mana Dengsolth - C: ###-#### call Mana before you go out for best time for inspection on footings Phone #: ###-#### Inspection requested via web by Kent Mortensen
|
BLD-Footing | 12/7/2015 | 12/7/2015 | 12/7/2015 | P | DEFR |
Jim Storey
|
|
|
Foundation Contractor - Mana Dengsolth - C: ###-#### call Mana before you go out for best time for inspection on footings Phone #: ###-#### Inspection requested via web by Kent Mortensen not ready rolled over to am.
|
BLD-Footing | 12/3/2015 | 12/3/2015 | 12/3/2015 | P | NR |
Jim Storey
|
|
|
Mana Phone #: ###-####
|