Permit Information
Permit NumberBLD15-02494
StatusFinaled
Name ESI
Site Address 195 S CAPITOL BLVD
Project NameBoise Centre East
Customer Number 
ePlanReviewYes
Description
THE DISTRICT CONVENTION CENTER FOR GBAD – BOISE CENTRE EAST AT CITY CENTER PLAZA – 1ST, 2ND, AND 4TH STORIES AND 5TH LEVEL) (10-5-16 PLAN MODIFICATION TO REMOVE THE CONVENTION CENTER KITCHEN FROM THE TENANT IMPROVEMENT SCOPE OF WORK AND TO DO THAT WORK UNDER NEW PERMIT BLD16-03512.) The fire sprinkler system is used for occupancy and to comply with the high-rise requirements of the building code.

1st Story Delivery: To construct a 525 square foot delivery area having direct access at grade to the exit passageway located between City Center Plaza and the Grove Hotel/CenturyLink Arena. Deliveries for the convention center will be brought from Capitol Blvd. to the delivery area through the exit passageway. Delivery vehicles are not allowed to be parked within the exit passageway. An interior elevator will connect the delivery area to the commercial kitchen located on the level directly above. Work is to include finishes, a freight elevator, a walk-in cooler, and a walk-in freezer. An 8” deep floor depression will be provided for the cooler and for the freezer to accommodate insulated floors. Condensate will drain to a floor sink.

1st Story Convention Center Elevator Lobby: To construct a 1,019 square foot grade level elevator lobby (343 square foot vestibule and 676 square foot lobby) to serve the convention center located on the 4th story above. The exterior entrance is connected directly to The Grove at grade. The non-rated lobby is also the continuation of a 2-hr fire-resistance-rated stairway enclosure to the outside. Work is to include suspended acoustical ceilings, suspended gypsum board ceilings, and finishes.

2nd Story (lower) Kitchen: To construct a 5,745 square foot commercial kitchen on the lower 2nd story to serve the convention center located on the 4th story above. Service elevators connect the kitchen to the convention center. Work is to include interior nonbearing walls, two restrooms accessible to the disabled, two grease hood, walk-in coolers, a walk-in freezers, kitchen equipment, suspended acoustical ceilings, and finishes. An 8” deep floor depression will be provided for the coolers and for the freezers to accommodate insulated floors. Condensate will drain to a floor sink.

2nd Story (upper) Escalator/Elevator Lobby and Pre-function / Bridge Connection: To construct a 2,977 square foot Elevator/Escalator Lobby and Pre-function area and a 1,692 square foot Bridge Connection area (4,669 square feet total) on the upper 2nd story to serve as access to the convention center located on the 4th story above. Occupants will generally arrive to this area across a bridge connected to the existing convention center. Escalators and elevators give access from the upper 2nd story to the convention center located on the 4th story above. The Elevator/Escalator Lobby and Pre-function area has access to two exits. The Bridge Connection will have access to one exit at one end and to another exit located within the existing convention center at the other end. Exit signs, emergency lighting, and panic hardware are required. Work is to include suspended acoustical ceilings, suspended gypsum board ceilings and soffits, and finishes.

4th Story Convention Center: To construct a Convention Center that will occupy the entire 49,767 square foot 4th story. Work is to include interior nonbearing walls, folding partitions, interior doors, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board soffits, and finishes. An assisted use toilet room is required because more than 6 water closets are required to serve the occupant load of the convention center. Some door modifications to two stairway enclosures are required to deal with the accumulative occupant loads resulting from the main exit. Special Inspection is required for welding. CJW (see the Comments field for the remainder of the scope of work).
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/16/201611/16/201611/16/2016PPASS
DetailsDave Hannah
Ok for permanent occupancy once bond is posted.
FIRE-Alarm Testing11/10/201611/10/201611/10/2016PDONE
DetailsTroy Cobbley
Fire Alarm Test of Horn strobes down Block 22 performed by Lee.
BLD-Final11/10/201611/10/201611/10/2016PPART
DetailsDave Hannah
BuildingFinal for Commercial Kitchen. In follow up to pre walk this week. On the books just to be safe. Call Adam with any questions. thanks akj. Phone #: ###-#### Inspection requested via web by Adam Johnson ok for perm occ after shell and core is finaled ok to occ/use
FIRE-Final Inspection11/10/201611/10/201611/10/2016PPASS
DetailsTroy Cobbley
Fire Life Safety inspection passed. Fire Alarm inspection performed and documented under FIR16-00128.
FIRE-Final Inspection11/9/201611/9/201611/9/2016PPART
DetailsTroy Cobbley
Final life safety field inspection completed for Commercial Kitchen area only of GBAD tenant. Pending approval of structural field inspector; OK for occupancy.
BLD-Final9/21/20169/21/20169/22/2016PPART
DetailsDave Hannah
Request to walk GBAD building for temp occ. Contact Adam on site. Jim has also been scheduled for PM today. All MEP''s have been acknowledged and signed off in the on site binder. Contact Adam when on site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson ok for temp occ
FIRE-Final Inspection9/20/20169/21/20169/21/2016PPART
DetailsJim Page
Partial life fire safety inspection complete. Fire sprinkler inspection complete for level 5 wet system, level 4 wet system, level 3 dry system, level 2 wet system, level 2 dry system and level 1 elevator lobby, fire sprinklers systems noted will be active before TCO. Fire alarm inspection complete for same area's as fire sprinklers, noted as well that fire alarms for these area's will be active before TCO. Fire extinguishers are in place with current inspection tags on level 5, level 4 and level 1 elevator lobby. Life fire safety inspection complete for level 5, level 4, level 3 parking and level 2 parking. Remaining levels 1 and 2 of convention center will be inspected at a later date.
BLD-Final9/1/20169/2/20169/2/2016APEND
DetailsDave Hannah
Nathan// 4th floor Phone #: ###-####
BLD-Conference9/1/20169/2/20169/2/2016APART
DetailsDave Hannah
Final inspection request for the District TI, 4th floor Clearwater only. Call Adam when onsite. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson ok for temp occ
FIRE-Final Inspection9/1/20169/1/20169/1/2016PPART
DetailsJim Page
Fire sprinkler inspection complete for city center level 4, fire alarm inspection for city center level 4 complete, fire extinguishers for level 4 city center are in place and will get current inspection tags installed from a licensed contractor. Partial final life fire safety inspection for level 4 complete (city center side of building is complete). Level 4 convention center side will need fire sprinkler, fire alarm and life fire safety inspections performed at a later date.
BLD-Ceiling Grid Inspection8/25/20168/25/20168/29/2016PPASS
DetailsDave Hannah
Additional ceiling grid inspections at 4th floor CW, West side, and East side corridors, potential west side meeting rooms. Please call when heading to site. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection8/24/20168/25/20168/25/2016APART
DetailsDave Hannah
Adam// 4th floor Clearwater bldg Phone #: ###-#### ok
BLD-Conference8/23/20168/23/20168/24/2016PPASS
DetailsDave Hannah
Adam Phone #: ###-####