(RIVER STREET STORAGE / OFFICE - Building "B") This permit is to construct a new 23,637 square foot office storage building and related site improvements. This building is separated into three separate buildings with fire walls creating three buildings each under 12,000 square feet. The building is not fire sprinklered and utilizes enhanced lighting to comply with the 2012 IECC. Scope of work includes: construction of a poured concrete foundation, construction of a wood and steel framed exterior envelope, [construction of interior non-bearing walls to create a 773 square foot office area, two family assist restrooms, and multiple storage units], installation of new windows and accessible doors, new electrical, new mechanical, new plumbing, site work, and interior finishes. NOTE: There are three permits on one set of plans. Building C (BLD15-02657) and building D (BLD15-02658) are on this set of plans. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/29/20164/29/20164/29/2016PPASS
DetailsDave Hannah
Bob Phone #: ###-####
FIRE-Final Inspection4/28/20164/29/20164/29/2016APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspections, exit signs/egress lighting/discharge landing lighting verfied, all operated correctly. Final life fire safety inspection passed/complete.
FIRE-Final Inspection4/28/20164/28/20164/28/2016PFAIL
DetailsJim Page
None of the exit signs/emergency lighting/discharge landing illumination located in the west section storage unit corridors could be verified for proper operation, there was tripped circuit breaker on lighting circuit and emergency power source was depleted, all exit lighting/emergency egress needs to be operable at time of final inspection. Discharge landing illumination needs to be tested/verified for proper operation , interior emergency lighting on these fixtures were operable when AC power source was isolated, multiple lights on discharge landings did not illuminate, inoperable discharge landing lights need to be repaired and operating at time of final inspection.
FIRE-Final Inspection4/21/20164/21/20164/21/2016PFAIL
DetailsTroy Cobbley
No small documents on site so Bob and I did a quick walk through. I noted missing sticker and indicator at the office exit. Opticons at the two gates will need to be tested by the fire dept prior to a sign off.
BLD-Other3/3/20163/4/20163/4/2016APASS
DetailsDave Hannah
Bob-firewall Phone #: ###-#### int side of 2hr fire walls ok
BLD-Other3/1/20163/2/20163/2/2016APASS
DetailsDave Hannah
Fire wall // Bob Phone #: ###-####
BLD-Energy code compliance3/1/20163/1/20163/2/2016PPASS
DetailsDave Hannah
Bob-Fire wall Phone #: ###-####
BLD-Energy code compliance2/29/20162/29/20162/29/2016PPART
DetailsDave Hannah
Bob Phone #: ###-#### walls and 2/3rds on the ceiling
BLD-Framing/Rough-in2/23/20162/23/20162/24/2016PPART
DetailsDave Hannah
Bob Phone #: ###-#### draft stops ok back firewall in attic ok
BLD-Framing/Rough-in2/18/20162/18/20162/18/2016PPART
DetailsMike Jordan
Bob Phone #: ###-####. roof trusses and draft stops. Needs to seal around penetrations in draft stops.
BLD-Other2/5/20162/8/20162/8/2016APASS
DetailsDave Hannah
firewall; Bob Phone #: ###-#### ok to cover ext prop line wall
BLD-Other2/5/20162/5/20162/6/2016PPASS
DetailsDave Hannah
Bob-sheet rock wall Phone #: ###-####ext fire wall along prop line ok to keep going
BLD-Wall Bracing2/1/20162/2/20162/2/2016APASS
DetailsDave Hannah
Phone #: ###-#### west and south walls ok to cover
BLD-Framing/Rough-in1/26/20161/26/20161/26/2016PCANC
DetailsPhil Shearer
Bob// Shear Wall Phone #: ###-####
BLD-Wall Bracing1/26/20161/26/20161/26/2016PPART
DetailsPhil Shearer
Bob// Shear Wall Phone #: ###-####. Grid line 8,9,10 OK to cover
BLD-Wall Bracing1/25/20161/26/20161/26/2016APART
DetailsPhil Shearer
Bob Phone #: ###-####. Wall on grid line 6, C, J are OK for cover
BLD-Other1/19/20161/19/20161/19/2016PPASS
DetailsDave Hannah
Roof nailing - Bob Phone #: ###-#### outter buildings ok to cover roofs
BLD-Footing10/21/201510/21/201510/22/2015PPASS
DetailsDave Hannah
Bob Phone #: ###-####
BLD-Foundation10/16/201510/19/201510/20/2015APASS
DetailsDave Hannah
stem wall; Bob Phone #: ###-####
BLD-Footing10/13/201510/14/201510/14/2015ANR
DetailsDave Hannah
Bob Phone #: ###-####