BLD-Final | 9/16/2016 | 9/19/2016 | 9/19/2016 | A | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Aging Inspection | 6/10/2016 | 6/10/2016 | 6/10/2016 | | PEND |
Mike Jordan
|
|
|
Pending zoning?
|
BLD-Final | 2/24/2016 | 2/25/2016 | 2/25/2016 | A | PART |
Mike Jordan
|
|
|
Kelly Phone #: ###-####. OK for temp occ. Will be ok for perm occ. once zoning signs perm.
|
FIRE-Final Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 2/22/2016 | 2/23/2016 | 2/23/2016 | A | NR |
Mike Jordan
|
|
|
Kelly Phone #: ###-####. Needs zoning and public works finals. Life/safety has failed. Needs to install handrail in unit #103. Carpet not installed.
|
FIRE-Final Inspection | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | FAIL |
Troy Cobbley
|
|
|
exposed pipe in Laundry Room and ceiling missing at one head in apartments 102 and 103
|
BLD-Framing/Rough-in | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | PASS |
Mike Jordan
|
|
|
Kelly Phone #: ###-####
|
BLD-Energy code compliance | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | PASS |
Mike Jordan
|
|
|
Kelly Phone #: ###-####
|
BLD-Framing/Rough-in | 12/31/2015 | 12/31/2015 | 12/31/2015 | P | FAIL |
Mike Jordan
|
|
|
Kelly Phone #: ###-####. Correction notice posted. Ok to insulate.
|
BLD-Wall Bracing | 12/30/2015 | 12/30/2015 | 12/30/2015 | P | PASS |
Jim Storey
|
|
|
Shear // Kelly Phone #: ###-####
|
BLD-Wall Bracing | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | NR |
Jim Sly
|
|
|
Kelly Phone #: ###-#### Called Contractor. Several Buildings on site ......No address #s posted ......No Erosion Control Placards installed.......No inspection performed.
|
BLD-Wall Bracing | 11/6/2015 | 11/6/2015 | 11/6/2015 | P | PASS |
Mike Jordan
|
|
|
Kelly Phone #: ###-####
|
BLD-Wall Bracing | 11/5/2015 | 11/5/2015 | 11/5/2015 | P | PASS |
Mike Jordan
|
|
|
Kelly Phone #: ###-####
|
BLD-Wall cover | 10/22/2015 | 10/22/2015 | 10/22/2015 | P | PASS |
Mike Jordan
|
|
|
Shear // Justin Phone #: ###-####
|
BLD-Footing | 10/15/2015 | 10/16/2015 | 10/16/2015 | A | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Footing | 10/15/2015 | 10/15/2015 | 10/15/2015 | P | PASS |
Mike Jordan
|
|
|
Interior thicken footings.
|
BLD-Energy code compliance | 10/12/2015 | 10/13/2015 | 10/13/2015 | A | PASS |
Mike Jordan
|
|
|
Insulation // Rob Phone #: ###-####. Rigid insulation on stemwall ok.
|
BLD-Foundation | 10/6/2015 | 10/7/2015 | 10/8/2015 | A | PART |
Mike Jordan
|
|
|
Manuel Phone #: ###-####. reinforcement ok. approved plans show that special inspection is required. contractor has not provided any other documentation staing otherwise.
|
BLD-Energy code compliance | 10/5/2015 | 10/5/2015 | 10/5/2015 | P | CANC |
Mike Jordan
|
|
|
Rob Phone #: ###-####
|
BLD-Footing | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|