BLD-Final | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | PASS |
Mike Jordan
|
|
|
Could you please call me to meet.
Thanks, Drew 208 ###-#### Phone #: ###-#### Inspection requested via web by David Moorhouse. OK for perm occ. ADA counter provided, shower has been capped off above ceiling and controls and shower head removed.
|
BLD-Final | 3/4/2016 | 3/4/2016 | 3/4/2016 | P | PART |
Mike Jordan
|
|
|
Requesting a final for this afternoon. Please call and I will meet you their. 208 ###-#### Thank you Drew Phone #: ###-#### Inspection requested via web by David Moorhouse. Provide ADA accessible counter, shower provided is not ADA compliant. Contractor has noted that they will cap off water supply and remove control valve and head.
|
FIRE-Final Inspection | 3/2/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarms, fire extinguishers have current inspection tags. Final life fire safety inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 2/12/2016 | 2/16/2016 | 2/16/2016 | A | PASS |
Mike Jordan
|
|
|
Grid Inspection Please
Thanks, Drew 208 ###-#### Phone #: ###-#### Inspection requested via web by David Moorhouse. ceiling grid ok. Needs to provide listed dampers at ceiling menmbrane and wall at med gas room.
|
BLD-Ceiling Grid Inspection | 1/29/2016 | 2/1/2016 | 2/1/2016 | A | NR |
Mike Jordan
|
|
|
Drew Phone #: ###-####. Needs MEP's rough in inspections first.
|
BLD-Framing/Rough-in | 12/31/2015 | 12/31/2015 | 12/31/2015 | A | PART |
Mike Jordan
|
|
|
Interior wood framed walls ok. Need to provide framing for 1hr. lid in gas room.
|