FIRE-Final Inspection | 3/20/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed per Scott Arellano
|
BLD-Final | 3/17/2017 | 3/20/2017 | 3/20/2017 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### final ok
|
BLD-Final | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | NR |
Jim Sly
|
|
|
Tom Phone #: ###-#### Need to verify that ACHD has been finaled. Need Fire alarm, Fire sprinkler and Fire/ Life safety Finals, To obtain C of O.
|
BLD-Final | 2/16/2017 | 2/16/2017 | 2/16/2017 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### final ok
|
BLD-Aging Inspection | 2/14/2017 | 2/14/2017 | 2/15/2017 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-#### temp ok/ glazing at 3/4 hr doors
|
FIRE-Final Inspection | 12/14/2016 | 12/15/2016 | 12/15/2016 | P | PART |
Jim Page
|
|
|
Partial life fire safety inspection complete for TCO, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, emergency lighting including exit discharge has been inspected, knox box is in place. Fuel island is still under construction, fuel island is under this permit and will be inspected when completed. Paint booth is to be built at a later date, paint booth has an FIR permit associated with the fire sprinklers that will remain in issued status until paint booth is complete (FIR16-00716) Exit sign that is in place for the paint shop exit is temporary, permanent exit sign for this area is on order, will verify install at a later date. Fire hydrants located on the northwest and southwestside of compound will need to be rotated so the large discharge is not pointing at bollards, fire hydrant rotation will be verified during permanet CO inspection.
|
BLD-Other | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Jim Storey
|
|
|
Tom-fire caulking above ceiling Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### ceillings ok all but rated walls
|
BLD-Other | 11/17/2016 | 11/18/2016 | 11/18/2016 | A | FAIL |
Jim Storey
|
|
|
Above ceiling // Tom Phone #: ###-#### provide listings for through pentrations
|
BLD-Ceiling Grid Inspection | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | CANC |
Phil Shearer
|
|
|
Dave Phone #: ###-####
|
BLD-Conference | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | PASS |
Jim Storey
|
|
|
tom ###-####
|
BLD-Framing/Rough-in | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-#### walked project with contractor
|
BLD-Framing/Rough-in | 9/9/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Concrete | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Conference | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Jim Storey
|
|
|
Fire Wall questions - Tom Phone #: ###-#### 9:00 appt
|
BLD-Conference | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | DEFR |
Jim Storey
|
|
|
Fire Wall questions - Tom Phone #: ###-####
|
BLD-Foundation | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PART |
Phil Shearer
|
|
|
Dave Phone #: ###-####. Pending MTI inspection
|
BLD-Footing | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-####placed w si
|
BLD-Footing | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### with si
|
BLD-Wall cover | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Wall Bracing | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | DEFR |
Jim Storey
|
|
|
Tom Phone #: ###-#### out of time
|
BLD-Foundation | 5/4/2016 | 5/5/2016 | 5/5/2016 | A | PASS |
Jim Storey
|
|
|
Rebar // Tom Phone #: ###-####wip/si
|
BLD-Footing | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Jim Storey
|
|
|
Spread footing & stemwall with 10AM pour - Tom Phone #: ###-####w/si
|
BLD-Other | 4/26/2016 | 4/27/2016 | 4/28/2016 | P | PASS |
Jim Storey
|
|
|
slab on grade - Tom Phone #: ###-####si pending out of time
|
BLD-Foundation | 4/19/2016 | 4/19/2016 | 4/20/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Footing | 4/14/2016 | 4/14/2016 | 4/14/2016 | P | PASS |
Jim Storey
|
|
|
Tom-spread footing and pier pads Phone #: ###-#### placed w/si
|
BLD-Footing | 4/8/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Footing | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Dave Phone #: ###-####
|
BLD-Foundation | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Jim Storey
|
|
|
would like call ahead; Tom Phone #: ###-####pwsi
|
BLD-Footing | 3/31/2016 | 4/1/2016 | 4/1/2016 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### placed w si
|
BLD-Foundation | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PART |
Jim Storey
|
|
|
would like call ahead; Tom Phone #: ###-#### wall ok pend s
|
BLD-Foundation | 3/25/2016 | 3/28/2016 | 3/28/2016 | A | PART |
Mike Jordan
|
|
|
Tom Phone #: ###-####. West concrete wall and column pad footings at main building. COlumn pad footings need rings at 3 inches on center and crossties. Special inspector to verify repair.
|
BLD-Footing | 3/21/2016 | 3/22/2016 | 3/22/2016 | A | DEFR |
Mike Jordan
|
|
|
Tom// 1pm pour time Phone #: ###-####. Special inspector on site.
|
BLD-Footing | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | CANC |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Foundation | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | PART |
Jim Storey
|
|
|
10:30 pour; Tom Phone #: ###-####pwsi
|
BLD-Footing | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Footing | 3/8/2016 | 3/9/2016 | 3/9/2016 | A | FAIL |
Jim Storey
|
|
|
Tom Phone #: ###-#### fill without compaction/ rebar in the dirt bottom and sides of foottings
|
BLD-Foundation | 2/29/2016 | 3/1/2016 | 3/1/2016 | A | PART |
Jim Storey
|
|
|
Wall // Tom Phone #: ###-#### pending si reports
|
BLD-Footing | 2/23/2016 | 2/24/2016 | 2/24/2016 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####pending si
|
BLD-Footing | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-#### pending si
|