Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD15-02792
StatusFinaled
Name STEED CONSTRUCTION
Site Address 7960 W RIFLEMAN ST Unit: 150
Project NameArtisan Optics Build Suite 150
Customer Number 
ePlanReviewYes
Description
(ARTISAN OPTICS – SUITE #150) Permit is to remodel existing 6,306 sq. ft. tenant space. This permit is approved contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls and construction of select interior non-bearing walls to create two new rooms and reduce the existing mechanical room, mechanical duct work, relocate lighting fixtures, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/28/201510/29/201510/29/2015PPASS
DetailsMike Jordan
Kent Phone #: ###-####
DOC - Permit Finaled10/29/201510/29/201510/29/2015PPASS
DetailsMike Jordan
FIRE-Final Inspection10/28/201510/28/201510/28/2015PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection10/20/201510/20/201510/20/2015PFAIL
DetailsTroy Cobbley
Provide ADA hardware for the pocket door, repair the exit signs and provide annual inspection for the fire extinguishers. Also need the project related fire sprinkler permit finaled.
BLD-Ceiling Grid Inspection10/14/201510/15/201510/15/2015PPART
DetailsMike Jordan
Kent Phone #: ###-####. ceiling grid ok, pending fire sprinkler rough in inspection.
BLD-Framing/Rough-in9/30/201510/1/201510/1/2015APASS
DetailsDave Hannah
Rob Phone #: ###-#### ok to cover after other trades ok