BLD-Final | 9/15/2016 | 9/16/2016 | 9/16/2016 | A | PASS |
Jim Storey
|
|
|
Call for access - Benji Phone #: ###-#### n/a on ele and plm listed equment
|
DOC - Permit Finaled | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Jim Page
|
|
|
Previously noted items have been addressed/repaired. No fire sprinklers, no fire alarms, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection passed/complete.
|
BLD-Final | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | NR |
Jim Storey
|
|
|
Benji// please call for access Phone #: ###-#### pending fire rfi
|
FIRE-Final Inspection | 7/7/2016 | 7/7/2016 | 7/7/2016 | P | FAIL |
Troy Cobbley
|
|
|
Per my interpretation of the drawings/scope of work atleast two exit signs are required, two fire extinguishers, new emergency lighting at the plane end of the tunnel and testing of the new lighting at the concourse end of the tunnel. Contractor is going to contact my supervisor to see if the intent is for the entire tunnel or just their new section.
|
BLD-Foundation | 4/29/2016 | 5/3/2016 | 5/3/2016 | A | PART |
Jim Storey
|
|
|
inspection will be on the airport inside the SIDA area so if you don''t have a SIDA badge I will have to escort you to the job. The airport will not let us start work before 9:00 AM so please schedule inspection after that time. Phone #: ###-#### Inspection requested via web by doug stanbrough insp. performed by si pending report
|