BLD-Final | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PASS |
Jim Storey
|
|
|
Richard Phone #: ###-####per planreview notes
|
DOC - Permit Finaled | 2/17/2017 | 2/17/2017 | 2/17/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | FAIL |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Submit plan mod to modify scope of work showing the removal of the 1hr. ceiling assembly from the shell scope of work. THis will have to completed on the tenant improvement work. Aslo the west exit door exterio landing needs to be at the same elevation as the interior slab.
|
FIRE-Final Inspection | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Remove the thumbturn deadbolt as discussed prior to a building inspection
|
BLD-Framing/Rough-in | 11/16/2016 | 11/17/2016 | 11/17/2016 | A | PASS |
Dave Hannah
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PART |
Mike Jordan
|
|
|
Richard Phone #: ###-####. Repairs to 1hr. soffit ok. ok to cover soffit. Architect to provide percent of unprotected openings on 1hr. wall. (windows).
|
BLD-Conference | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | DONE |
Mike Jordan
|
|
|
Richard Phone #: ###-####
|
BLD-Final | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | NR |
Jim Storey
|
|
|
Richard Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PART |
Jim Storey
|
|
|
Richard Phone #: ###-#### c/n on site
|
BLD-Wall Bracing | 4/6/2016 | 4/7/2016 | 4/7/2016 | A | PASS |
Mike Jordan
|
|
|
call for access; Richard Phone #: ###-####
|
BLD-Foundation | 3/7/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 3/4/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Perimeter footings.
|