BLD-Final | 3/3/2017 | 3/6/2017 | 3/6/2017 | P | PASS |
Jim Sly
|
|
|
Adin Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 3/1/2017 | 3/2/2017 | 3/2/2017 | A | NR |
Jim Sly
|
|
|
Adin Phone #: ###-####
|
FIRE-Final Inspection | 2/28/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Adin was going to conference with the building inspector for requirements o the one hour riser room. I noted holes in the wall and the interior doors bottom sweep catching on the carpet.
|
FIRE-Final Inspection | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide panic hardware on the two west side doors, mount occupant load signs, provide Riser Room signage on exterior door, provide one hour riser room, provide small documents, provide 20' clearance on the south gate to the west side parking area that accesses the west side of the building.
|
FIRE-Conference | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | DONE |
Katie Marron
|
|
|
Discussed existing gate width of 18' with Ron Johnson. He is ok with it as is since no work being completed on gate or grading and gate is not required for access to riser room. Email attached to case.
|
BLD-Conference | 1/13/2017 | 1/17/2017 | 1/17/2017 | A | DONE |
Jim Sly
|
|
|
Adim Phone #: ###-####
|
BLD-Final | 12/9/2016 | 12/9/2016 | 12/9/2016 | A | PEND |
Jim Sly
|
|
|
Contractor to call for final insp......
|
BLD-Aging Inspection | 12/9/2016 | 12/9/2016 | 12/9/2016 | | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | DONE |
Jim Sly
|
|
|
Adin Phone #: ###-#### Framing OK at North wall openings.
|
BLD-Framing/Rough-in | 7/27/2016 | 7/28/2016 | 7/28/2016 | A | PART |
Jim Sly
|
|
|
Adin-front canopy Phone #: ###-#### Pull test for Special inspection on epoxy bolting for steel columns was approved . Canopy Framing......OK.
|
FIRE-Conference | 7/27/2016 | 7/28/2016 | 7/28/2016 | P | DONE |
Troy Cobbley
|
|
|
Draft stops for the upright sprinklers installed piping can be covered.
|
BLD-Conference | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | DONE |
Jim Sly
|
|
|
Adin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Jim Sly
|
|
|
Adin Phone #: ###-####
|
BLD-Conference | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | DONE |
Jim Sly
|
|
|
Adin Phone #: ###-####
|
BLD-Foundation | 2/16/2016 | 2/17/2016 | 2/17/2016 | A | PART |
Jim Sly
|
|
|
Ardi Phone #: ###-#### Stairs OK.
|
BLD-Other | 1/27/2016 | 1/28/2016 | 1/28/2016 | A | NR |
Jim Sly
|
|
|
Ardi-ramp Phone #: ###-####
|
BLD-Footing | 12/2/2015 | 12/2/2015 | 12/2/2015 | P | NR |
Jim Sly
|
|
|
Ari Phone #: ###-#### Not ready for inspection.....Talked with Ari. Need Special insp on soils, reinforcement, epoxy and test samples. No agency notified yet.
|