BLD-Final | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Sam Phone #: ###-####
|
DOC - Permit Finaled | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | NR |
Brandon Shaw
|
|
|
Need PW to approve the roof storm drainage system...
|
BLD-Aging Inspection | 1/18/2019 | 1/18/2019 | 1/18/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 1/17/2019 | 1/17/2019 | 1/17/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Other | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Brandon Shaw
|
|
|
sofit- Sam Phone #: ###-####
|
BLD-Other | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | CANC |
Brandon Shaw
|
|
|
Cancel per Sam softits- Sam Phone #: ###-####
|
BLD-Other | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | PART |
Brandon Shaw
|
|
|
Work in progress... Under deck and covered deck area
|
BLD-Energy code compliance | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Energy code compliance | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 8/27/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Shear corrections SAT... As per walk thu... Add straps at breaks in double top plates Tripple ply grider to bear down to foundation See red paint OK to insulate
|
BLD-Framing/Rough-in | 8/17/2018 | 8/21/2018 | 8/21/2018 | A | FAIL |
Brandon Shaw
|
|
|
Address to be visible form the street... Need trades rough in approvals... No air/foam seal... Wall bracing failed a) Hold down and straps to be as per plans b) Per S1.1, details 5 & 6, 2x6 walls to be 16" O.C. c) Anchor bolts to be not more than 12" from ends of sill plates See red paint
|
BLD-Conference | 3/21/2018 | 3/21/2018 | 3/21/2018 | A | PEND |
Bob Archibald
|
|
|
Recieved request for permit reactivation. Permit may be reactivated for 1/2 of original fee (only footings inspections have been completed).
|
BLD-Aging Inspection | 5/25/2016 | 5/25/2016 | 5/25/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Aging Inspection | 5/24/2016 | 5/24/2016 | 5/24/2016 | | PEND |
Phil Shearer
|
|
|
|
BLD-Foundation | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Phil Shearer
|
|
|
J.R. Phone #: ###-####
|
BLD-Foundation | 12/23/2015 | 12/24/2015 | 12/24/2015 | A | PASS |
Phil Shearer
|
|
|
J.R. Phone #: ###-####
|
BLD-Footing | 12/11/2015 | 12/14/2015 | 12/14/2015 | P | PART |
Tony Young
|
|
|
J.R. Phone #: ###-####,, crawl area,, work in progress,, will pour 12/15,, will blanket forms tonight
|
BLD-Foundation | 12/2/2015 | 12/3/2015 | 12/3/2015 | A | PASS |
Phil Shearer
|
|
|
JR Phone #: ###-####
|
BLD-Foundation | 12/1/2015 | 12/2/2015 | 12/2/2015 | P | CANC |
Phil Shearer
|
|
|
FIrst thing PM please, would like to pour @ 2 - JR Phone #: ###-####
|
BLD-Footing | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 11/19/2015 | 11/19/2015 | 11/19/2015 | P | NR |
Phil Shearer
|
|
|
Pouring at 1 - JR Phone #: ###-####
|
BLD-Footing | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | CANC |
Phil Shearer
|
|
|
Pouring at 1 - JR Phone #: ###-####
|
BLD-Footing | 11/18/2015 | 11/18/2015 | 11/18/2015 | P | CANC |
Phil Shearer
|
|
|
Pouring at 3 - JR Phone #: ###-####
|
BLD-Footing | 11/17/2015 | 11/18/2015 | 11/18/2015 | A | CANC |
Phil Shearer
|
|
|
Pouring at 3 - JR Phone #: ###-####
|
BLD-Foundation | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | PASS |
Phil Shearer
|
|
|
Pouring at 3 - JR Phone #: ###-####
|
BLD-Footing | 11/4/2015 | 11/5/2015 | 11/6/2015 | P | PART |
Phil Shearer
|
|
|
JR Phone #: ###-####-- pour time is 330 Basement only
|