BLD-Aging Inspection | 5/5/2016 | 5/5/2016 | 5/10/2016 | | PEND |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/9/2016 | 5/9/2016 | 5/10/2016 | A | CANC |
Dave Hannah
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Aging Inspection | 5/4/2016 | 5/4/2016 | 5/10/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 12/20/2015 | 12/21/2015 | 12/22/2015 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacobs
|
BLD-Framing/Rough-in | 12/17/2015 | 12/17/2015 | 12/18/2015 | P | PART |
Dave Hannah
|
|
|
Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacob house only ok to insulate but do not cover antill mec rough in is done
|
BLD-Framing/Rough-in | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | CANC |
Dave Hannah
|
|
|
As early as possible Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacobs
|
BLD-Framing/Rough-in | 12/14/2015 | 12/15/2015 | 12/15/2015 | A | NR |
Dave Hannah
|
|
|
Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacobs still needs mec rough ins
|
BLD-Framing/Rough-in | 12/10/2015 | 12/11/2015 | 12/11/2015 | P | NR |
Dave Hannah
|
|
|
As late as possible Phone #: 2087242306 >> Inspection requested via mobile web by Buck Jacobs needs mec r/i and air seal installed
|
BLD-Wall Bracing | 11/19/2015 | 11/19/2015 | 11/20/2015 | P | PASS |
Dave Hannah
|
|
|
Duillermo Phone #: ###-#### garage ok to cover ext
|
BLD-Wall Bracing | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | PASS |
Dave Hannah
|
|
|
Guillermo Phone #: ###-####
|
BLD-Footing | 10/5/2015 | 10/6/2015 | 10/6/2015 | A | PASS |
Dave Hannah
|
|
|
Jerrod Phone #: ###-####
|