Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-03005
StatusFinaled
Name SYRINGA CONSTRUCTION LLC
Site Address 1833 E RIDGECREST DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Applicant to pay an additional $904.25 for geotech services. **DAF** WUI Zone A; Permit for the construction of a new 3496 sq. ft., two story (first story 1838 sq. ft., basement is 1658 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 543sq. ft. of covered patio’s/porches and 798 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. 2. Before any footings or load bearing column pads (interior or exterior) are poured, the soils engineer (Dave Cram or Elizabeth Brown at Materials Testing & Inspection) shall inspect and provide written approval (soils engineer only) that the foundation subgrade soil conditions are as indicated in the approved soils report. This report shall approve the native subgrade condition, native soil compaction, structural fill compaction, under drain approval, and foundation drain approval (additional letter may be submitted after foundations are poured but prior to backfill activities). The Building Department will not perform a footing inspection until after the soil engineer’s letter for the footing subgrade has been approved by Boise City Public Works.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/24/20165/26/20165/26/2016PPASS
DetailsMike Jordan
Grading inspection with Jason Taylor Thursday am. Final inspection and C of O PM. Garage code is 0713. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
DOC - Permit Finaled5/26/20165/26/20165/26/2016PPASS
DetailsMike Jordan
BLD-Grading Inspection5/24/20165/26/20165/25/2016ACANC
DetailsDave Hannah
Need erosion control and grading and drainage inspection with Jason Taylor. Please coordinate for Thursday am. Thank you, steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
BLD-Energy code compliance2/22/20162/24/20162/24/2016APASS
DetailsDave Hannah
Framing final and insulation approval. Plans are on site by power panel. Call steve with any question or comments. thanks. Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Wall Bracing2/22/20162/22/20162/22/2016PPASS
DetailsDave Hannah
BLD-Framing/Rough-in2/22/20162/22/20162/22/2016PPART
DetailsDave Hannah
ok to insulate c/n on site
BLD-Conference2/18/20162/22/20162/22/2016ADONE
DetailsDave Hannah
Framing Inspection. Call Steve Hanson with questions 850.8424. Plans on HVAC platform. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Framing/Rough-in2/8/20162/9/20162/9/2016ANR
DetailsDave Hannah
Plans are on site near fireplace. home is open for inspection. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Foundation1/13/20161/13/20161/13/2016APASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing1/12/20161/12/20161/12/2016PPASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing1/7/20161/7/20161/7/2016PCANC
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Foundation12/2/201512/2/201512/2/2015PPASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing11/17/201511/17/201511/18/2015PPART
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron basement ftgs ok to place concrete
BLD-Footing11/16/201511/16/201511/16/2015PNR
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing11/10/201511/10/201511/10/2015PCANC
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron