BLD-Final | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 6/17/2016 | 6/17/2016 | 6/17/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/7/2016 | 6/8/2016 | 6/8/2016 | A | PEND |
Jim Sly
|
|
|
For part temp only // Tucker Phone #: ###-#### Leaving Permit open.......They may modify plan and do some more work.........On approval from P.D.S.
|
BLD-Final | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PART |
Jim Sly
|
|
|
Jason Phone #: ###-#### OK for Temp. Occ. OK for perm. Occ. when Electrical Perms.
|
FIRE-Final Inspection | 2/9/2016 | 2/9/2016 | 2/9/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Sprinkler Rough-in | 2/8/2016 | 2/9/2016 | 2/9/2016 | A | FAIL |
Troy Cobbley
|
|
|
Repair the "request to exit" buttons on the two east doors.
|
FIRE-Final Inspection | 2/5/2016 | 2/5/2016 | 2/5/2016 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to final when the access controled egress doors meet all six of the requriements of IFC as noted in red on the plans sheet 2. The fire alarm interconnect was tested and passed today.
|
BLD-Ceiling Grid Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 12/7/2015 | 12/8/2015 | 12/8/2015 | A | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-####
|