Permit Information
Permit NumberBLD15-03218
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 7633 W GRATZ DR
Project NameLyle Pearson - Acura
Customer Number 
ePlanReviewYes
Description
(LYLE PEARSON - ACURA SERVICE BUILDING) This permit is to construct a new 4,316 square foot auto service building and related site improvements. **Plan Modification 10-23-15 - Modification to change CMU block exterior walls from 10 inch to 8 inch. TLW** The building is not fire sprinklered and utilizes enhanced lighting to comply with the 2012 IECC. Scope of work includes: construction of a poured concrete foundation, construction of CMU exterior envelope, [construction of interior non-bearing walls to create a special tools room, a unisex restroom, and a fluids room], installation of new windows and accessible doors, new electrical, new mechanical, new class I hood, new plumbing, site work, and interior finishes. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/7/20167/8/20167/8/2016APASS
DetailsMike Jordan
Ready for full final now that electrical work by owners vendor has been inspected and finaled. Phone #: ###-#### Inspection requested via web by Mike Walling.
ok for perm occ.
BLD-Final3/25/20163/25/20163/25/2016PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Mike Walling. Ok for temp occ. Will be ok for perm. occ. once electrical signs perm.
FIRE-Final Inspection3/24/20163/24/20163/24/2016PPASS
DetailsTroy Cobbley
Life safety passed. Door hardware was not installed on doors but was on site and appeared correct. It would be installed prior to the building inspection
BLD-Framing/Rough-in3/1/20163/1/20163/1/2016APASS
DetailsMike Jordan
Framing and shear wall inspection Phone #: ###-#### Inspection requested via web by Mike Walling. INterior steel stud framed walls and shear walls ok.
BLD-Conference2/10/20162/10/20162/10/2016APASS
DetailsMike Jordan
Progress inspection. Structural steel complete with special inspection. Conference on railing at ramp. Thanks. Phone #: ###-#### Inspection requested via web by Mike Walling
BLD-Concrete1/14/20161/14/20161/14/2016PPART
DetailsMike Jordan
Grout for first lift at North elevation at 3:00.
Thanks!! Phone #: ###-#### Inspection requested via web by Mike Walling. Work in progress. Pending special inspection.
BLD-Conference1/5/20161/6/20161/6/2016PPASS
DetailsMike Jordan
Grout for 4th lift at 4:00 p.m. Phone #: ###-#### Inspection requested via web by Mike Walling. Work in progress on 12ft. to 16ft. elevation south east and west walls.
BLD-Other12/22/201512/23/201512/23/2015APASS
DetailsMike Jordan
Structural block, 4'' lift Phone #: ###-#### Inspection requested via web by Mike Walling. East, west and south walls, 0fty. to 4ft. elevation. Special inspector on site, ICC cert. verified.
BLD-Other12/22/201512/22/201512/22/2015PCANC
DetailsMike Jordan
Structural block first lift at lower footing step.

Phone #: ###-#### Inspection requested via web by Mike Walling. Moved to 12-23 in the am.
BLD-Footing11/17/201511/17/201511/17/2015PPART
DetailsJim Sly
Mike Phone #: ###-####
MTI employee Brad Gehlen Certification verified ....OK Stem walls OK pending M T I special inspection, tests and approvals.
BLD-Foundation11/10/201511/10/201511/10/2015PPART
DetailsMike Jordan
Tim gave ok for inspection plan mod is being done on the walls. Any questions talk with Tim W // Leonard Phone #: ###-####. Placement completed when arrived on site. Special inspector on site, need to confirm ICC cert.