Permit Information
Permit NumberBLD15-03338
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 10118 W OVERLAND RD
Project NameRiver City Surgical Center
Customer Number 
ePlanReviewYes
Description
(RIVER CITY SURGICAL CENTER - BUILDING #1)**(PLAN MODIFICATION - To enlarge operating rooms, enlarge the sterile room, enlarge the janitors room, enlarge and reconfigure restroom 117, removing storage room 116, shift the exterior door 123b opening, shift med gas room, shift nurse station/hallway wall, adding wall and new door at break room.) JG ** Permit is to remodel an existing 2808 sq. ft. tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of interior nonbearing walls leaving only the mechanical room walls in place, remove window and portion of exterior wall for new door at riser room and ADA Ramp, new construction of interior non-bearing walls to create (med gas room, two operating rooms, sterile room, janitors closet, compressor room, three ADA compliant restrooms, laundry room, locker room with ADA compliant roll in shower, break room, IT closet, two offices, riser room, reception/waiting area, storage room, four pre/post operation rooms, nurse’s station area and hallways), new ADA compliant exterior ramp, relocated front entry door, code compliant stoop with steps, electrical work, mechanical work, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. Note: Med Gas room to have 1 hour fire barrier walls up to the underside of the roof deck. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/12/20165/12/20165/12/2016PPASS
DetailsMike Jordan
David Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection5/9/20165/9/20165/9/2016PPASS
DetailsTroy Cobbley
life safety passed
BLD-Conference5/4/20165/4/20165/4/2016PDONE
DetailsMike Jordan
David Phone #: ###-####. walk through with contractor. Noted vertcal grab bars installed to far from rear wall. New handrails not yet installed.
BLD-Ceiling Grid Inspection4/8/20164/8/20164/8/2016PPASS
DetailsMike Jordan
David Phone #: ###-####
BLD-Conference3/23/20163/23/20163/23/2016PPASS
DetailsMike Jordan
David Phone #: ###-####. Went over new ADA ramp. prior to concrete placement.
BLD-Conference3/21/20163/21/20163/21/2016PDONE
DetailsMike Jordan
David Phone #: ###-####. noted new ADA ramp at south side of building has greater than 9% slope.
BLD-Conference3/14/20163/15/20163/15/2016ADONE
DetailsMike Jordan
David Phone #: ###-####
BLD-Conference2/16/20162/17/20162/17/2016ADONE
DetailsMike Jordan
BLD-Wall cover2/16/20162/17/20162/17/2016APART
DetailsMike Jordan
David Phone #: ###-####. Reviewed new 1hr. wall details. Contractor to get detail for 1hr. roof ceiling.
BLD-Conference2/16/20162/16/20162/16/2016PCANC
DetailsMike Jordan
BLD-Framing/Rough-in2/11/20162/12/20162/12/2016PPART
DetailsJim Storey
David// prefers as late as possible Phone #: ###-#### ok to cover all BUT gas rm need fire barrior details for opening protection and roof listing 1 hr / fire riser rm opening protection
FIRE-Conference12/23/201512/23/201512/23/2015PDONE
DetailsJim Page