Description |
(RIVER CITY SURGICAL CENTER - BUILDING #1)**(PLAN MODIFICATION - To enlarge operating rooms, enlarge the sterile room, enlarge the janitors room, enlarge and reconfigure restroom 117, removing storage room 116, shift the exterior door 123b opening, shift med gas room, shift nurse station/hallway wall, adding wall and new door at break room.) JG ** Permit is to remodel an existing 2808 sq. ft. tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of interior nonbearing walls leaving only the mechanical room walls in place, remove window and portion of exterior wall for new door at riser room and ADA Ramp, new construction of interior non-bearing walls to create (med gas room, two operating rooms, sterile room, janitors closet, compressor room, three ADA compliant restrooms, laundry room, locker room with ADA compliant roll in shower, break room, IT closet, two offices, riser room, reception/waiting area, storage room, four pre/post operation rooms, nurse’s station area and hallways), new ADA compliant exterior ramp, relocated front entry door, code compliant stoop with steps, electrical work, mechanical work, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. Note: Med Gas room to have 1 hour fire barrier walls up to the underside of the roof deck. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
|