BLD-Final | 4/18/2016 | 4/18/2016 | 4/20/2016 | P | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Final | 4/14/2016 | 4/15/2016 | 4/15/2016 | P | PART |
Jim Storey
|
|
|
Kelly Phone #: ###-####-fire to be done early PM need p&z sign off/ temp ok basement cleared out at insp. temp on mech
|
FIRE-Final Inspection | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is in place with current inspection tag. Final life fire safety inspection passed/complete
|
BLD-Ceiling Grid Inspection | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Conference | 4/8/2016 | 4/8/2016 | 4/9/2016 | P | DONE |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
FIRE-Conference | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | DONE |
Jim Page
|
|
|
Life fire safety conference complete
|
BLD-Other | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | PASS |
Dave Hannah
|
|
|
fire wall sheathing - Kelly Phone #: ###-####
|
BLD-Energy code compliance | 2/26/2016 | 2/29/2016 | 3/1/2016 | P | PART |
Dave Hannah
|
|
|
Kelly Phone #: ###-#### ok to start sheetrocking firewalls and insulation in ceiling
|
BLD-Framing/Rough-in | 2/25/2016 | 2/25/2016 | 2/26/2016 | P | PART |
Dave Hannah
|
|
|
For Part; part is where the modification is // Kelly Phone #: ###-#### ok to insulate 2hr fire wall and ceiling
|