BLD-Final | 12/12/2016 | 12/12/2016 | 12/12/2016 | P | PASS |
Dave Hannah
|
|
|
Josh/ please call ahead Phone #: ###-####
|
BLD-Final | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PART |
Dave Hannah
|
|
|
Josh// please call ahead Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 12/5/2016 | 12/5/2016 | 12/5/2016 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher mounted in common area with current inspection tag. Final life fire safety inspection passed/complete.
|
BLD-Conference | 11/22/2016 | 11/22/2016 | 11/22/2016 | P | PASS |
Dave Hannah
|
|
|
Josua-please call 30 minutes prior to meet Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/26/2016 | 10/26/2016 | 10/26/2016 | P | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|
BLD-Framing/Rough-in | 10/6/2016 | 10/7/2016 | 10/10/2016 | A | PART |
Dave Hannah
|
|
|
Josh-2nd half-struc steel and 1st floor wood system Phone #: ###-#### ok to insulate floor/ceiling
|
BLD-Framing/Rough-in | 9/8/2016 | 9/9/2016 | 9/9/2016 | P | PASS |
Dave Hannah
|
|
|
Josh Phone #: ###-####
|
BLD-Conference | 7/6/2016 | 7/6/2016 | 7/7/2016 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Footing | 6/24/2016 | 6/27/2016 | 6/27/2016 | A | PEND |
Dave Hannah
|
|
|
Shawn Phone #: ###-####
|