Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD15-03428
StatusFinaled
Name WESTERN IDAHO BUILDERS
Site Address 2581 S BROADWAY AVE
Project NameJacksons Broadway
Customer Number 
ePlanReviewYes
Description
(JACKSON'S FOOD STORE / CARWASH) Demolish existing 2,357 sq.ft store and replace with new 4,130 sq.ft store with car wash per the approved plans and any notations and attached engineering. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/6/20165/6/20165/6/2016PPASS
DetailsJim Storey
Morgan Phone #: ###-####
BLD-Ceiling Grid Inspection4/13/20164/14/20164/14/2016PPASS
DetailsJim Storey
Morgan Phone #: ###-####
BLD-Final4/14/20164/14/20164/14/2016PPASS
DetailsJim Storey
Morgan Phone #: ###-#### temp holding for P & z bond posted
FIRE-Final Inspection4/12/20164/13/20164/13/2016PPASS
DetailsTroy Cobbley
Life safety passed. Previous corrections have been corrected. I tested the emergency off which functioned correctly.
FIRE-Final Inspection4/11/20164/12/20164/12/2016PFAIL
DetailsJim Page
Signage reading "Door to remain unlocked when building is occupied" needs to be installed at main entry. The main entry has a double keyed deadbolt assembly installed, this deadbolt is going to remain, the northeast exterior exit door also has double keyed deadbolt, this door needs single action door hardware installed, one double keyed deadbolt is allowed. CO2 tank located in the storage room of building needs to be in place and secured from possible tipping before next inspection. Provide small documentation that is associated with city approved drawings at next inspection.
BLD-Ceiling Grid Inspection3/30/20163/30/20163/30/2016PPASS
DetailsJim Storey
Kenny Phone #: ###-####
BLD-Energy code compliance2/16/20162/17/20162/17/2016APASS
DetailsJim Storey
Insulation // Kenny Phone #: ###-####
BLD-Framing/Rough-in2/11/20162/12/20162/12/2016PPASS
DetailsJim Storey
Kenny Phone #: ###-#### pending roof insulation value
BLD-Other1/22/20161/25/20161/25/2016PPASS
DetailsJim Storey
Kenny/// roof nailing inspection Phone #: ###-#### roof straps and nailling ok to cover //need r22 verified.
BLD-Foundation12/22/201512/23/201512/23/2015APASS
DetailsJim Storey
Kenny-rebar wall-pour time 11:00 Phone #: ###-#### pending si report
BLD-Foundation12/21/201512/22/201512/22/2015APART
DetailsJim Storey
KENNY-- POUR TIME IS 8AM Phone #: ###-#### placed wiyh si
BLD-Foundation12/9/201512/10/201512/10/2015APASS
DetailsJim Sly
Kenny Phone #: ###-####
BLD-Foundation11/30/201512/1/201512/1/2015APASS
DetailsJim Storey
Kenny// pour time is 11am Phone #: ###-####