Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-03430
StatusFinaled
Name INTERIOR SYSTEMS INC
Site Address 350 N MILWAUKEE ST Unit: 2319
Project NameBTS - #2130
Customer Number 
ePlanReviewNo
Description
(Shell and Core – BTS #2130 – Interior Demo) This permit is to perform interior non-structural demo work only. This space was last remodeled for GGP offices under BLD97-02328. Scope of work: includes removal of non-bearing interior partition walls, removal of existing plumbing, removal of interior finishes, removal of all existing outlets and wiring back to the box or properly terminated above ceiling line, removal of some existing light fixtures. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Do not remove ceiling unless sprinkler coverage is able to be maintained in accordance with the Boise City Fire Dept. BCC resolution 13535 11-2-10 **TLW**.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/9/201511/10/201511/10/2015APASS
DetailsMike Jordan
Robert Phone #: ###-####
DOC - Permit Finaled11/10/201511/10/201511/10/2015PPASS
DetailsMike Jordan
FIRE-Final Inspection11/10/201511/10/201511/10/2015PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final10/13/201510/14/201510/14/2015PNR
DetailsMike Jordan
Dustin Phone #: ###-####. Fire/life/safety final has failed.
FIRE-Final Inspection10/13/201510/14/201510/14/2015AFAIL
DetailsTroy Cobbley
Need suite number corrected, need the fire sprinkler system modified and the smoke evac system modifed due to the removal of the ceiling and wall systems. Also the Boise Fire Dept needs to be notified the system has been impaired.