Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-03489
StatusFinaled
Name BIG D CONSTRUCTION
Site Address 400 S CAPITOL BLVD
Project NameResidence Inn by Marriott
Customer Number 
ePlanReviewYes
Description
**PROJECT MANAGEMENT-Angie Brosious**(RESIDENCE INN BY MARRIOTT)PLAN MODIFICATION FOR IPE DECKING/ ACCESSIBLE ROUTE ON 3RD FLOOR DECK/ ADDITIONAL DETIALS FOR FINISH MATERIAL ON DECKS/CANOPIES AND PROJECTIOSN. FIRE SPRINKLER MODIFICATION REQUIRED FOR CHANGES RECIEVED. **AJS**11/28/17RFI206 PLAN MODIFICATION FOR SLAB FIX AND DOOR TO ALLEY OFF ELECTRICAL ROOM ONLY 2/1/17**AJA**PLAN MODIFICATION FOR RELCATED MECHANICAL UNIT RFI 0131 12/2/16** PLAN MODIFICATION FOR CCD15 AND CCD15.1 ONLY **AJS** Permit to construct a new 204,396 square foot hotel / restaurant / assembly high-rise building. PLAN MODIFICATION 4-7-16 - Modification submitted to change cast iron plumbing to ABS plumbing. **TLW** This building consists of 8 stories of residential hotel above two stories of parking garage / restaurant. A foundation permit was issued for this project under BLD15-02707. Work to include: construction of new rated concrete building, new plumbing, new electrical, new mechanical, new fire sprinklers, new shafts, new interior partitions, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is to be fully fire sprinklered with an NFPA 13 system and fully alarmed with a NFPA 72 system. **TLW** //// REFERENCE BLD15-02707 FOR INSPECTIONS PRIOR TO 8/16/17 (Concrete/Framing/Energy) -- ALD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/18/20181/18/20181/19/2018PPASS
DetailsDave Hannah
Nathan Phone #: ###-####
BLD-Final1/17/20181/18/20181/19/2018APASS
DetailsDave Hannah
Nathan Phone #: ###-####
BLD-Final1/19/20181/19/20181/19/2018PPASS
DetailsDave Hannah
FIRE-Final Inspection1/19/20181/19/20181/19/2018PPASS
DetailsJim Page
Final life fire safety inspection complete.
BLD-Other11/15/201711/16/201711/16/2017APASS
DetailsDave Hannah
Nathan-energy in the floor Phone #: ###-####
FIRE-Conference11/15/201711/16/201711/16/2017ADONE
DetailsJim Page
Fire conference complete, mineral wool is installed over the foam that was exposed in the penthouse spaces.
BLD-Other11/13/201711/13/201711/13/2017PCANC
DetailsDave Hannah
Penthouse insulation - Nathan Phone #: ###-#### // cancelled per Nathan 9:39am 11/13 //leg
FIRE-Conference11/13/201711/13/201711/13/2017PCANC
DetailsJim Page
Penthouse insulation - Nathan Phone #: ###-#### // cancelled per Nathan 9:39am 11/13 //leg
FIRE-Final Inspection10/27/201710/30/201710/30/2017APART
DetailsTroy Cobbley
TCO for 10th floor and all level 02 Rooms.

Scott Phone #: ###-####
BLD-Final10/27/201710/27/201710/30/2017PPART
DetailsDave Hannah
Scott Phone #: ###-#### Requesting TCO for balance of project (10th floor and 02 rooms).ok to occ 10th
FIRE-Final Inspection10/27/201710/27/201710/27/2017PCANC
DetailsTroy Cobbley
Need to cancel due to time constraints. Scott is going to reschedule for monday.

Scott Phone #: ###-#### Requesting TCO for balance of project (10th floor and 02 rooms).
BLD-Final10/16/201710/17/201710/17/2017APART
DetailsDave Hannah
Garage- TCO- Scott Phone #: ###-#### ok for temp occ on second floorparking garage
FIRE-Final Inspection10/16/201710/17/201710/17/2017APART
DetailsJim Page
Life fire safety inspection for level 2 TCO complete. Chemical placard will be placed on door of pool pump/chemical storage for swimming pool, placard will be verified at final BLD life fire safety inspection for project.
FIRE-Conference10/12/201710/12/201710/12/2017PDONE
DetailsJim Page
Walk through with Boise Fire department complete.
BLD-Final10/10/201710/10/201710/10/2017PPEND
DetailsDave Hannah
Temp Occ to open hotel // Scott Phone #: ###-#### ok for temp occ on 1st floor and floors 3thru 9 ok for genral public
FIRE-Final Inspection10/10/201710/11/201710/10/2017APART
DetailsJim Page
Life fire safety for level 3 TCO complete, double key deadbolts on the northwest patio's off of capitol room will stay per conversation between Dave Hannah and I, signage will need to be installed reading "Door to remain unlocked while occupied". All construction debris will need to be removed from level 3 patio area before access of personnel other than construction is allowed. Gaurds will need to be installed around fire pit areas before final C of O.
BLD-Final10/6/201710/9/201710/9/2017PPART
DetailsDave Hannah
Chandler Phone #: ###-#### ok for temp occ staff only
FIRE-Final Inspection10/6/201710/9/201710/9/2017APART
DetailsJim Page
Signature for life fire safety TCO requested has been completed for public occupancy excluding 2nd and 10th floors and also excluding the 3rd floor.
FIRE-Final Inspection10/6/201710/6/201710/6/2017PPART
DetailsJim Page
Defeciency list items for TCO requested levels, level 1 and levels 4 through 9 have been repaired with exception to the areas missing the photo luminescent tape on the handrails, Life fire safety inspection complete for TCO covered areas, TCO authorized for life fire safety per conversation with Ron Johnson.
BLD-Final10/3/201710/5/201710/5/2017PNR
DetailsDave Hannah
George Phone #: ###-####
FIRE-Final Inspection10/4/201710/5/201710/5/2017AFAIL
DetailsJim Page
Life fire safety deficiency list sent by email to Scott, Project Manager.
BLD-Ceiling Grid Inspection9/20/20179/20/20179/20/2017PPASS
DetailsDave Hannah
ceiling for common areas level 3 // George Phone #: ###-####
FIRE-Conference9/12/20179/12/20179/12/2017PDONE
DetailsJim Page
Fire conference for TCO discussion complete.
BLD-Framing/Rough-in9/7/20179/7/20179/7/2017PPASS
DetailsDave Hannah
George, ceiling level 3 corridor and fitness room Phone #: ###-####
BLD-Framing/Rough-in8/30/20178/31/20178/31/2017APASS
DetailsDave Hannah
Nathan Phone #: ###-####
BLD-Ceiling Grid Inspection8/30/20178/30/20178/30/2017PPASS
DetailsDave Hannah
George Phone #: ###-####
FIRE-Conference8/23/20178/24/20178/24/2017ADONE
DetailsJim Page
Fire conference complete
BLD-Ceiling Grid Inspection8/17/20178/21/20178/23/2017PPASS
DetailsDave Hannah
Nathan Phone #: ###-####
BLD-Framing/Rough-in8/16/20178/17/20178/17/2017APART
DetailsDave Hannah
Nate, overhead ceiling tile for 1st floor Phone #: ###-#### needs to fire stop wall pent
BLD-Other8/17/20178/17/20178/17/2017ADONE
DetailsAlexandra L. DeYoung
REFERENCE BLD15-02707 FOR INSPECTIONS PRIOR TO 8/16/17 (Concrete/Framing/Energy) -- ALD
BLD-Ceiling Grid Inspection8/10/20178/11/20178/11/2017APART
DetailsBrandon Shaw
02 Rooms-
Level 3-10, 1 bedroom Kings, Soithwest corner
BLD-Other8/10/20178/10/20178/10/2017PPASS
DetailsBrandon Shaw
Llinen shoot fire proofing, OK
BLD-Framing/Rough-in12/12/201612/13/201612/13/2016APASS
DetailsDave Hannah
level 4 roof framing - James Phone #: ###-####
BLD-Concrete  8/29/2016PPART
DetailsMike Jordan
BLD-Conference  8/19/2016PDEFR
DetailsMike Jordan
BLD-Concrete  8/16/2016PDEFR
DetailsMike Jordan
BLD-Concrete  8/9/2016PPEND
DetailsDave Hannah
BLD-Concrete  8/5/2016PPEND
DetailsDave Hannah
BLD-Concrete  7/28/2016PPEND
DetailsDave Hannah
BLD-Concrete7/13/20167/13/20167/14/2016PPEND
DetailsDave Hannah
Level 4 south PT deck reinforcement. Structural Engineer has been onsite and has reviewed. SI has been on site and is scheduled for the pour. Concrete pour scheduled for 9:30 pm tonight. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete7/7/20167/8/20167/8/2016APEND
DetailsDave Hannah
Walls at elevator core level 3-4, misc. columns. concrete scheduled for 10 am Saturday. MTI has been on site for periodic special inspections and is also scheduled. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation6/14/20166/14/20166/27/2016APASS
DetailsDave Hannah
Foundation wall stair core 2 level 2-3. MTI has been onsite for progress inspections and is scheduled. Concrete scheduled for 10 am tomorrow.

PT deck level 3 pour 1 is ready. Concrete scheduled for Wednesday 9 pm Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete6/24/20166/24/20166/24/2016APART
DetailsMike Jordan
PT suspended slab Pour #2 level 3. SI has been doing periodic inspections all week. SI will be onsite today and for pour. Concrete scheduled for 10 pm tonight. Phone #: ###-#### Inspection requested via web by Jim Williams. Work in progress.
ok after special inspection has signed off.
BLD-Conference6/1/20166/2/20166/14/2016APEND
DetailsDave Hannah
stair core 3 level 2.Concrete scheduled for 3pm. SI scheduled and will be onsite. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation5/12/20165/12/20165/12/2016APASS
DetailsDave Hannah
pool wall level 2. PT suspended slab level 2 pour 3. Concrete scheduled for 2 am 5/13 for PT deck. Friday afternoon 2 pm. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete4/28/20164/28/20165/5/2016PPART
DetailsDave Hannah
PT suspended concrete slab level 2 pour 2. Concrete scheduled for 2 am 4/29. Elevator core wall reinforcement. 100''- 116'' elevation. MTI has been on site and conducted inspected. SS is scheduled to be on site for pours. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation5/3/20165/3/20165/4/2016PPEND
DetailsDave Hannah
Stair core 1 from elevation 116'' to 127'' rebar, Concrete scheduled for 5/4 2pm. Would like to begin buttoning up forms this afternoon Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete4/12/20164/12/20164/14/2016PPEND
DetailsDave Hannah
Suspended PT level 2 deck Grid lines A-H 6.5-10 pour 1 of three.
Structural engineer and MTI have been onsite and reviewed. Concrete scheduled for 3 am tomorrow.

FR 16x20 footing Grids 1-H Concrete schedules 4 pm today Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing3/9/20163/10/20163/11/2016APEND
DetailsDave Hannah
FS footing grid line C 1.9 and 3, Columns grid C-4 , D.5-5 and B-6 Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation3/7/20163/7/20163/10/2016PPASS
DetailsDave Hannah
Stair 3 core walls , 4 columns grids H-7,C.5 6-7,C-5 2 pm concrete. SI has already reviewed rebar and will be on site. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation2/29/20163/1/20163/2/2016APASS
DetailsDave Hannah
Perimeter foundation XY grid SW. Concrete pier Grid 5;6 at grid A. Concrete columns grid C.5 6.3-7. and grid H -7.Concrete scheduled for 2 pm SI has been scheduled and already inspected column reinforcement prior to form placement Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing2/18/20162/18/20162/19/2016APEND
DetailsDave Hannah
Footings Grid line A-1-3.5: Grid line 1 A-C. Concrete scheduled for 11:00 am. SI scheduled and will be onsite for pour. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation2/15/20162/16/20162/18/2016PPEND
DetailsDave Hannah
Foundation reinforcement stair 1 grid line F 9-10, Column reinforcement grid lines 6-8 A-H Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Conference2/10/20162/11/20162/11/2016ADEFR
DetailsMike Jordan
FS footings and continuous exterior footings Grid line A 4-6.5; Exterior continuous footings. Grid line H 4-6.5 Concrete scheduled 8am SI has already reviewed rebar and is scheduled onsite for tomorrows pour. Phone #: ###-#### Inspection requested via web by Jim Williams. Special inspection has approved. Concrete placement in progress. Special inspector on site.
BLD-Foundation2/4/20162/4/20162/4/2016PPEND
DetailsDave Hannah
Grid line A 7-10, Grid line H 7-10, Tower crane base foundation. 10 am Friday concrete scheduled. Phone #: ###-#### Inspection requested via web by Jim Williams ok after s/i sign off
BLD-Foundation1/29/20161/29/20162/1/2016APASS
DetailsDave Hannah
3'' Foundation wall Grid line 10- B.8-H; Grid line H 8.8-10. Concrete scheduled for 2 pm. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing1/27/20161/28/20161/28/2016APART
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Jim Williams
Inspection of Select large footing pads for columns.........OK pending MTI special inspections, tests and approvals.