BLD-Aging Inspection | 8/30/2017 | 8/30/2017 | 8/31/2017 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/31/2017 | 8/31/2017 | 8/31/2017 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | PASS |
Brandon Shaw
|
|
|
James Phone #: ###-####. Open plumbing permit finaled.
|
BLD-Final | 4/12/2017 | 4/13/2017 | 4/13/2017 | P | PART |
Brandon Shaw
|
|
|
James-please call 30 minutes prior to meet for access Phone #: ###-#### Clear open plumbing permit, final to be okay'd then.
|
BLD-Aging Inspection | 2/16/2017 | 2/16/2017 | 2/22/2017 | | CANC |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/15/2017 | 2/15/2017 | 2/22/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 10/3/2016 | 10/3/2016 | 10/4/2016 | P | PASS |
Dave Hannah
|
|
|
Jack Phone #: ###-####
|
BLD-Foundation | 8/9/2016 | 8/9/2016 | 8/9/2016 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Footing | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Footing | 7/25/2016 | 7/26/2016 | 7/26/2016 | A | FAIL |
Mike Jordan
|
|
|
Jason Phone #: ###-####. North footing not the rquired 1ft in depth. Missing the 4 #5 rebar in east footing, also needs to raise reinforcement in footings to obtain the minimum 3 inch clearance from the ground.
|
BLD-Footing | 7/18/2016 | 7/20/2016 | 7/20/2016 | A | FAIL |
Phil Shearer
|
|
|
Change day and time per Jason.... Jason Phone #: ###-####. Need sub grade inspection
|