BLD-Final | 6/27/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Tony Young
|
|
|
Tj Phone #: ###-####,, ok for occupancy pending others
|
BLD-Conference | 6/24/2016 | 6/27/2016 | 6/27/2016 | A | NR |
Tony Young
|
|
|
Tj Phone #: ###-####,, needs zoning,, address #s, occupancy posting
|
FIRE-Final Inspection | 6/24/2016 | 6/27/2016 | 6/27/2016 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags, commercial hood is type II hood, a fire suppression sustem is not required. Exterior egress lights will be re-installed after stucco is completed. Final life fire safety inspection passed/complete
|
BLD-Wall cover | 4/22/2016 | 4/25/2016 | 4/25/2016 | A | PASS |
Tony Young
|
|
|
TJ Phone #: ###-####,, ok to cover now
|
BLD-Framing/Rough-in | 4/20/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Tony Young
|
|
|
TJ Phone #: ###-####,, ok to sheet rock
|
BLD-Framing/Rough-in | 4/19/2016 | 4/20/2016 | 4/20/2016 | P | PART |
Tony Young
|
|
|
TJ Phone #: ###-####,, need to fireblock a few areas,, ok to start sheetrocking the lid,, will need to see more of the new cut in doors in the rear side wall
|
BLD-Wall cover | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PART |
Tony Young
|
|
|
TJ Phone #: ###-####,, rear south fire wall above ceiling ok,, ok to insulate pending trades
|
BLD-Wall cover | 3/23/2016 | 3/25/2016 | 3/25/2016 | A | DEFR |
Tony Young
|
|
|
TJ Phone #: ###-####
|
BLD-Framing/Rough-in | 3/22/2016 | 3/23/2016 | 3/23/2016 | P | PART |
Tony Young
|
|
|
TJ Phone #: ###-####,, 1st layer of south firewall ok,, ok to start 2nd layer
|
BLD-Framing/Rough-in | 3/22/2016 | 3/22/2016 | 3/22/2016 | P | PART |
Tony Young
|
|
|
TJ Phone #: ###-####,, south/west wall 1st layer 5/8" sheet rock,, work in place,, ok,, remainder of framing ok
|
BLD-Conference | 2/24/2016 | 2/24/2016 | 2/24/2016 | P | PART |
Tony Young
|
|
|
fireblocking; TJ Phone #: ###-####,, fire wall block backing,, work in progress,, ok so far south side
|
BLD-Conference | 2/17/2016 | 2/24/2016 | 2/24/2016 | A | PART |
Tony Young
|
|
|
would like call ahead; TJ Phone #: ###-####,, architect meeting with plan review
|
BLD-Conference | 2/22/2016 | 2/23/2016 | 2/23/2016 | A | PEND |
Tony Young
|
|
|
TJ Phone #: ###-####
|
BLD-Conference | 2/17/2016 | 2/17/2016 | 2/17/2016 | P | PART |
Tony Young
|
|
|
would like call ahead; TJ Phone #: ###-#### ,, opened up ceiling areas for horizontal firewall areas to start rebuilding backing,, ok so far
|
BLD-Conference | 2/9/2016 | 2/11/2016 | 2/11/2016 | A | PEND |
Tony Young
|
|
|
would like call ahead; TJ Phone #: ###-####
|
BLD-Conference | 2/8/2016 | 2/9/2016 | 2/9/2016 | P | PEND |
Tony Young
|
|
|
would like call ahead; TJ Phone #: ###-####, conf with Bruce Poe, architect on firewalls,, need to get detail to plan review
|
BLD-Conference | 2/2/2016 | 2/3/2016 | 2/3/2016 | A | FAIL |
Jim Storey
|
|
|
TJ-please call to meet Phone #: ###-#### arch to provide 1 hr assembley and address drops that will not meet listing for roof assembly as well as conbustable space.
|
BLD-Conference | 1/7/2016 | 1/11/2016 | 1/11/2016 | A | PASS |
Tony Young
|
|
|
TJ Phone #: ###-####,, 2 hour wall ?s,, stuff with fire mineral wool,, then 2 layers of 5/8" rock,, fire caulk
|