BLD-Final | 2/2/2016 | 2/2/2016 | 2/2/2016 | P | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
DOC - Permit Finaled | 2/2/2016 | 2/2/2016 | 2/2/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/28/2016 | 1/28/2016 | 1/28/2016 | P | NR |
Jim Sly
|
|
|
Robert Phone #: ###-#### need mech gas piping final.
|
FIRE-Final Inspection | 1/28/2016 | 1/28/2016 | 1/28/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Provide sticker at main exit as discussed prior to a building inspection
|
BLD-Final | 1/20/2016 | 1/21/2016 | 1/22/2016 | P | NR |
Jim Sly
|
|
|
Robert Phone #: ###-#### Need fire final.
|
FIRE-Final Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | FAIL |
Troy Cobbley
|
|
|
The pendant sprinkler head at the new restroom is overspaced. The maximum spacing for these heads is 130 sq. ft. Also automatic flush bolts are needed for the inactive leaf of the main exit or get with plan review and see if hardware can be deleted.
|
BLD-Framing/Rough-in | 12/21/2015 | 12/22/2015 | 12/22/2015 | A | PART |
Jim Sly
|
|
|
Derick Phone #: ###-#### Framing per plan OK. Framing at office space......not on approved plan< needs to be approved by PDS Dept. Derick said he would have approval by final insp.
|