Information based on query as of Tuesday, June 18, 2024.
Permit Information
Permit NumberBLD15-03767
StatusFinaled
Name SAGE INTERNATIONAL SCHOOL OF BOISE
Site Address 421 E PARKCENTER BLVD
Project NameSage International School
Customer Number 
ePlanReviewYes
Description
(SAGE INTERNATIONAL SCHOOL – Phase II) This project is to convert the remainder of an existing covered mall building (Parkcenter Mall) into a new school. PLAN MODIFICATION - Plan mod to change a previously approved double door to a single 42 inch wide door due to structural constraints. 2-12-16 **TLW** The building is fire sprinklered for area increase. Under Phase I 30,0000 square feet of the Northern part of the building was built out (BLD14-00884). Under this phase the remaining 54,850 square feet will be built out with new classrooms, a library, cafeteria, and common area. Work is to include: [structural upgrades including: new wood sheer walls, new wood hold-downs, new drag sheer blocking and strapping, new wood headers, and concrete repairs], exterior site improvements, [construction of interior non-bearing walls to create 27 classrooms, 5 offices, 6 core restrooms, a staff room, two multipurpose assembly rooms, and a library], installation of new exterior windows, installation of a new roof on the entire structure, installation of accessible doors / hardware, installation of the second side of a two-hour wall assembly (first side completed in phase I), and interior finishes. NOTE: This permit fulfills the “Upgrade Agreement” on file for this building. When the building is finaled a request to nullify the existing “Upgrade Agreement” based on completion of this work should be submitted. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/28/20167/28/20167/28/2016PPASS
DetailsJim Storey
DOC - Permit Finaled7/28/20167/28/20167/28/2016PPASS
DetailsJim Storey
FIRE-Final Inspection7/28/20167/28/20167/28/2016PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Final7/27/20167/28/20167/28/2016ANR
DetailsJim Storey
Boyd Phone #: ###-####
FIRE-Final Inspection7/27/20167/27/20167/27/2016PCANC
DetailsJim Page
Inspection request cancelled, FIR permits for fire alarm and fire sprinklers still in issued status, inspections for these permits needs to be completed and passed before life fire safety inspection can be performed.
BLD-Ceiling Grid Inspection6/17/20166/20/20166/20/2016APASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Ceiling Grid Inspection6/3/20166/6/20166/6/2016APASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Ceiling Grid Inspection5/12/20165/13/20165/13/2016APASS
DetailsJim Storey
Boyd Phone #: ###-#### 1 of 4 ok pending trades
BLD-Framing/Rough-in5/12/20165/13/20165/13/2016APASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Framing/Rough-in4/8/20164/8/20164/8/2016PPASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Energy code compliance3/22/20163/23/20163/23/2016APASS
DetailsJim Storey
Boyd Phone #: ###-#### west drag strut in place with hold downs straps an hangers/ all exterior and roof insulation ok
BLD-Framing/Rough-in3/18/20163/18/20163/18/2016PPASS
DetailsJim Storey
Boyd Phone #: ###-#### colm supports at openings ok/ roof openings ok/ mez resupport ok/ backing for ada ok
BLD-Framing/Rough-in3/8/20163/8/20163/8/2016PPASS
DetailsJim Storey
Boyd Phone #: ###-####
BLD-Framing/Rough-in2/26/20162/26/20162/26/2016PPASS
DetailsJim Storey
First inspection please for SE Corner - Boyd Phone #: ###-#### phase 1 ok pending si report for epoxy hardware and headers ok to cover/ footting ok at mez