BLD-Final | 2/19/2016 | 2/19/2016 | 2/19/2016 | P | PASS |
Dave Hannah
|
|
|
would like call ahead; Paula Phone #: ###-####
|
BLD-Final | 2/18/2016 | 2/18/2016 | 2/18/2016 | P | PART |
Phil Shearer
|
|
|
would like call ahead; Paula Phone #: ###-####. Need new side door hardware. OK for Temp CO
|
FIRE-Final Inspection | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to provide automatic flush bolts on the double exit door and single action hardware on the north exit door prior to a building inspection as per conversation.
|
BLD-Ceiling Grid Inspection | 2/16/2016 | 2/16/2016 | 2/16/2016 | P | PASS |
Phil Shearer
|
|
|
would like call ahead; Paula Phone #: ###-####
|
BLD-Framing/Rough-in | 1/25/2016 | 1/26/2016 | 1/26/2016 | A | PASS |
Phil Shearer
|
|
|
Ken Phone #: ###-####. Soffit OK to cover
|
BLD-Framing/Rough-in | 1/14/2016 | 1/14/2016 | 1/14/2016 | P | PART |
Phil Shearer
|
|
|
Ken Phone #: ###-####. Back rooms ok for cover
|