Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD15-03835
StatusFinaled
Name MICHAEL J BROWN
Site Address 505 W BROAD ST
Project NameThe Fowler - Below Podium TI
Customer NumberREF:BLD15-03423 & 3424
ePlanReview 
Description
(THE FOWLER – Core Area Build Out – Below Podium Structure) **GREEN TAG-Expedited Review-LEED Project - PROJECT MANAGEMENT-Angie Brosious**Plan mod for ASI046 only, removing partition wall in commercial space A/B and D and associated plumbing and mechanical. **6-2-17**ajs**Permit to build out a new 68,730 square foot (2) story shell building originally constructed under BLD15-02043. The first floor is around 34,000 square feet and the second floor is around 34,730 square feet. This building is fully fire sprinklered with an NFPA 13 system to comply with the 5 story wood construction ordinance. Scope of work includes: [installation of interior non-bearing walls and bearing walls to create 5 live/work units, four future tenant spaces on the first floor, and accessory office / residential amenidty rooms on the second floor], new plumbing, new electrical, new mechanical, new insulation, new windows, new doors, and interior finishes in compliance with Chapter 8 of the 2012 IBC. NOTE: the tenant spaces on the first floor are not allowed occupancy until a separate permit is pulled to remodel and occupy those spaces. This building will be sprinklered with a fully compliant NFPA 13 system to comply with the 5 story wood construction ordinance. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/7/20183/8/20183/7/2018APASS
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Final2/28/20183/1/20183/2/2018PPEND
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Final3/1/20183/2/20183/2/2018APASS
DetailsDave Hannah
Jason Phone #: ###-####
FIRE-Final Inspection2/28/20183/1/20183/1/2018APASS
DetailsJim Page
Final life fire safety inspection for this permit complete.
FIRE-Final Inspection2/22/20182/22/20182/22/2018PFAIL
DetailsJim Page
Provide as-builts for stairwell pressurization activation automatic function/manual function and overide, fire alarm permit will not be finaled until as-builts are submitted and approved.
FIRE-Final Inspection1/29/20181/29/20181/29/2018PPART
DetailsJim Page
Fire sprinkler inspection complete for level 1 lobby and level 2 common areas. Fire alarm testing partially complete for parking levels, additional notification required on level 1.5 landing on southside of garage. Fire alarm testing complete for level 1 lobby and level 2 common areas. Fire extinguishers are in place with current inspection tags.
BLD-Final1/25/20181/26/20181/29/2018PPEND
DetailsDave Hannah
Level 1 and 2 not 2nd garage live work units Jason Phone #: ###-####
FIRE-Final Inspection1/25/20181/26/20181/26/2018PCANC
DetailsJim Page
Inspection request for life fire safety TCO will be rescheduled for 29JAN2018.
BLD-Final1/19/20181/23/20181/23/2018PPEND
DetailsDave Hannah
Jason Phone #: ###-####
FIRE-Final Inspection1/22/20181/23/20181/23/2018ACANC
DetailsJim Page
Issues with fire alarm on level 6, more testing needs to be completed before TCO, this request is cancelled.
FIRE-Final Inspection1/19/20181/22/20181/22/2018ACANC
DetailsJim Page
Due to inspection load, this inspection will be rescheduled by Jason Phone #: ###-#### for 9AM, this request is cancelled.
BLD-Conference1/3/20181/3/20181/4/2018PDONE
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Ceiling Grid Inspection1/2/20181/2/20181/2/2018PPASS
DetailsDave Hannah
Inspection request for the ceiling grid at the management office. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
BLD-Final12/20/201712/22/201712/22/2017APART
DetailsDave Hannah
Jason Phone #: ###-####

Dave, requesting partial final for garage only up to mezzanine. Chad has signed off for mechancal on card in my office. Sarah is going out this afternoon to inspect garage interior. Public Works sign off not needed for this phase. Thanks, Angie ok for temp occ obn phase one parking garege only.
FIRE-Final Inspection12/18/201712/19/201712/19/2017APART
DetailsJim Page
Life fire safety inspection for phase 1 TCO complete.
BLD-Conference12/4/201712/5/201712/5/2017PDONE
DetailsDave Hannah
Jason Phone #: ###-####
BLD-Conference11/17/201711/20/201711/20/2017APASS
DetailsDave Hannah
Conference request for Core ; Shell. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
BLD-Ceiling Grid Inspection11/16/201711/17/201711/17/2017APASS
DetailsDave Hannah
Inspection request for the ceiling grid in the Live Works and Housing lobby. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Ceiling Grid Inspection10/30/201710/30/201710/30/2017APASS
DetailsDave Hannah
Inspection Request for ceiling grids and wall covering. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus
BLD-Ceiling Grid Inspection10/24/201710/25/201710/25/2017AFAIL
DetailsDave Hannah
Inspection request for (2) two grid ceilings on the first floor. Phone #: ###-#### Inspection requested via web by Guillaume Chatelus fire stopping above ceiling
BLD-Other10/19/201710/20/201710/20/2017APASS
DetailsDave Hannah
Monte-fire wall in trash room Phone #: ###-####
BLD-Ceiling Grid Inspection10/16/201710/17/201710/17/2017APASS
DetailsDave Hannah
Monty-3A Phone #: ###-####
BLD-Ceiling Grid Inspection9/20/20179/21/20179/21/2017APASS
DetailsDave Hannah
level 5 & 6 // Monte Phone #: ###-####
BLD-Framing/Rough-in9/19/20179/20/20179/20/2017APART
DetailsDave Hannah
Inspection request for 5th floor Drop Ceilings. Phone #: ###-#### Inspection requested via web by Carl Benjamin needs to fix some fire assemblies
BLD-Energy code compliance9/19/20179/20/20179/20/2017APASS
DetailsDave Hannah
Inspection request for Live Works ! thru 5 Insulation and main entry Lobby fire caulking Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Framing/Rough-in9/18/20179/19/20179/19/2017APASS
DetailsDave Hannah
6B roof & ceiling 5A & 5B - Monty Phone #: ###-#### 6B only ok to cover
BLD-Framing/Rough-in9/15/20179/18/20179/18/2017AFAIL
DetailsDave Hannah
Inspection request for framing in the entry lobby walls. Phone #: ###-#### Inspection requested via web by Carl Benjamin
BLD-Ceiling Grid Inspection9/11/20179/12/20179/12/2017APASS
DetailsDave Hannah
7th floor // monte Phone #: ###-####
BLD-Framing/Rough-in8/8/20178/9/20178/9/2017APART
DetailsBrandon Shaw
For the Mechanical Soffit Framing at the garage side of the Live work.
BLD-Aging Inspection7/7/20177/7/20177/7/2017 PASS
DetailsDave Hannah
BLD-Other5/26/20175/30/20175/30/2017APASS
DetailsDave Hannah
Live work , fire caulking - Carl Phone #: ###-####
BLD-Conference4/5/20174/6/20174/6/2017APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Carl Benjamin ok to use fire details for first floor work live units
BLD-Framing/Rough-in2/22/20172/22/20172/23/2017PPART
DetailsDave Hannah
Chris Phone #: ###-#### ext framing first and second floor ok to cover ext.
BLD-Framing/Rough-in1/18/20171/19/20171/20/2017APART
DetailsDave Hannah
Inspection request for Metal Stud Framing at East Elevation of Floors 1 and 2. Phone #: ###-#### Inspection requested via web by Carl Benjamin ok to cover ext e
wall