BLD-Final | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | FAIL |
Mike Jordan
|
|
|
Damon Phone #: ###-####. Provide the city set of approved plans. Tempered glazing required on either side of doorway in hall to masterbedroom. Correction notice posted.
|
BLD-Final | 3/28/2016 | 3/29/2016 | 3/29/2016 | A | NH |
Mike Jordan
|
|
|
Damien Phone #: ###-####
|
BLD-Framing/Rough-in | 1/11/2016 | 1/12/2016 | 1/12/2016 | A | PART |
Mike Jordan
|
|
|
Daimon Phone #: ###-####. All repairs done. Pending mech. rough in inspection.
|
BLD-Framing/Rough-in | 12/29/2015 | 12/29/2015 | 12/29/2015 | P | FAIL |
Mike Jordan
|
|
|
would like call ahead; Bob Phone #: ###-####. Provide the additional LVL at back patio and provide reinspection for mech.
|
BLD-Energy code compliance | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | FAIL |
Dave Hannah
|
|
|
Damon Phone #: ###-#### c/n on site
|
BLD-Framing/Rough-in | 11/30/2015 | 12/1/2015 | 12/2/2015 | P | NR |
Dave Hannah
|
|
|
Bob Phone #: ###-#### needs mec permit and rough in
|
BLD-Wall Bracing | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | DONE |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 11/9/2015 | 11/10/2015 | 11/10/2015 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 10/26/2015 | 10/27/2015 | 10/27/2015 | A | PASS |
Dave Hannah
|
|
|
Damien Phone #: ###-####
|
BLD-Footing | 10/23/2015 | 10/26/2015 | 10/26/2015 | A | PASS |
Dave Hannah
|
|
|
Damion-pour time 10:00 Phone #: ###-####
|