DOC - Permit Finaled | | | 1/25/2017 | | DONE |
Christina Prado
|
|
|
As per BLD15-04346 final on 8/9/16
|
FIRE-Final Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per Boise Fire Dept. a man gate will not be required at the new hanger building allowing access to the flight line due to additional fire hydrants near the flight line and vehicle access from a neigboring street and gate.
|
BLD-Aging Inspection | 6/3/2016 | 6/3/2016 | 6/3/2016 | | FAIL |
Jim Storey
|
|
|
|
BLD-Conference | 3/28/2016 | 3/29/2016 | 3/30/2016 | A | PART |
Bill VanDegrift
|
|
|
haven't tested stormdrain, waiting for dry weather
|
BLD-Foundation | 1/20/2016 | 1/21/2016 | 1/21/2016 | P | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
BLD-Foundation | 1/14/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
BLD-Foundation | 1/8/2016 | 1/12/2016 | 1/12/2016 | A | PASS |
Jim Storey
|
|
|
Change to AM on 1-12 per Matt Phone #: ###-####
|
BLD-Footing | 1/5/2016 | 1/5/2016 | 1/5/2016 | P | PASS |
Phil Shearer
|
|
|
Matt ###-#### Footings on gird lines 7, and A.
|