BLD-Final | 6/29/2016 | 7/5/2016 | 7/5/2016 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Scheibe
|
DOC - Permit Finaled | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | PASS |
Tony Young
|
|
|
c of c/o issued,, placed in drawer upstairs
|
BLD-Final | 6/29/2016 | 6/29/2016 | 6/29/2016 | P | PEND |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Scheibe
|
BLD-Final | 6/28/2016 | 6/29/2016 | 6/29/2016 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Scheibe,, ok pending plumbing finals and hand/guard rail fix
|
BLD-Conference | 6/27/2016 | 6/28/2016 | 6/28/2016 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Scheibe,, need guardrails and handrail per code,, also needs zoning final,, walk through only
|
BLD-Framing/Rough-in | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Tony Young
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2016 | 2/22/2016 | 2/22/2016 | A | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, frame issues ok,, still need mech. rough in on vents,, etc.,, gas line has been approved,, ok to insulate
|
BLD-Framing/Rough-in | 2/16/2016 | 2/17/2016 | 2/17/2016 | P | FAIL |
Tony Young
|
|
|
###-#### Tim,, c/n posted,, need to reinspect
|
BLD-Wall Bracing | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
BLD-Foundation | 12/24/2015 | 12/24/2015 | 12/28/2015 | P | DONE |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 12/23/2015 | 12/23/2015 | 12/24/2015 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####
|