BLD-Final | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | DONE |
Tony Young
|
|
|
as per phone call with Tony Young all requirments were met
|
BLD-Final | 7/19/2016 | 7/21/2016 | 7/21/2016 | P | PART |
Jim Storey
|
|
|
Mark Phone #: ###-#### Informed Mark, as of 10:44am 7/19, that C & S Excavation hasn't paid for their permit or had inspections need health dept insp/
|
FIRE-Final Inspection | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 7/19/2016 | 7/20/2016 | 7/20/2016 | A | CANC |
Jim Page
|
|
|
Inspection request will need to be rescheduled to coincide with FIR permit final.
|
BLD-Conference | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PEND |
Tony Young
|
|
|
Mark Phone #: ###-####,, walk through only,, need trades,, historical,, guard rails per code,, handrails per code,, etc.
|
BLD-Energy code compliance | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Exterior walls ok. Needs to complete airseal pak and fire block interior walls.
|
BLD-Energy code compliance | 5/27/2016 | 5/31/2016 | 5/31/2016 | P | NR |
Dave Hannah
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 5/27/2016 | 5/27/2016 | 5/27/2016 | P | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, walls ok to insulate main level
|
BLD-Conference | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Tony Young
|
|
|
Mark Phone #: ###-####,, walk through on frame
|
BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | NR |
Tony Young
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 5/18/2016 | 5/18/2016 | 5/18/2016 | P | PART |
Tony Young
|
|
|
partial frame on roof-Mark Phone #: ###-####,, ROOF NAILING OK
|
BLD-Foundation | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PART |
Tony Young
|
|
|
rebar; Mark Phone #: ###-####,, ok pending special inspection
|
BLD-Footing | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | CANC |
Tony Young
|
|
|
Late if possible // Mark Phone #: ###-####
|
BLD-Foundation | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | CANC |
Tony Young
|
|
|
Late if possible......Rebar // Mark Phone #: ###-####
|