Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-04239
StatusFinaled
Name STEED CONSTRUCTION
Site Address 2910 E AMITY RD
Project NameHayden Beverage - Relocation
Customer Number 
ePlanReviewYes
Description
**Project Management-Ron Hill**(HAYDEN BEVERAGE - Loading Dock Addition) Phase I permit for exterior and interiror improvements to an existing 175,990 sq.ft. building with work to include partial removal exterior wall sections to accomodate new overhead doors and the construction of a new below grade loading dock approaches per the approved plans. This is a fully fire sprinklered building for unlimited area. No racking is allowed under this permit. A separate racking permit is required for any racking over 8 feet in height. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. Phase 2 being done under separate permit of BLD15-04516. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/19/20169/19/20169/19/2016PPASS
DetailsJim Storey
BLD-Conference8/9/20168/10/20168/10/2016APASS
DetailsJim Storey
I've tried to contact someone on this to have them either extend the temp c of o or call in inspections to final. No one calls me back. Can you check to see if they are ready to have the building final?wip
BLD-Aging Inspection6/14/20166/14/20166/14/2016 PASS
DetailsJim Storey
BLD-Final4/13/20164/14/20164/14/2016PPART
DetailsJim Storey
Odi Phone #: ###-#### temp ok
FIRE-Final Inspection4/13/20164/14/20164/14/2016APASS
DetailsJim Page
Previously noted items addressed/repaired. Final life fire safety inspection for phase 1 passedcomplete.
BLD-Final3/15/20163/17/20163/17/2016ANR
DetailsJim Storey
Temp approval - Odie Phone #: ###-####
FIRE-Final Inspection3/14/20163/15/20163/15/2016PPART
DetailsJim Page
Fire sprinkler inspection for phase 1 complete, fire alarm inspection for phase 1 complete, fire extinguishers for phase 1 in place with current inspection tags. Exit discharge illumination not installed at time of inspection, light fixtures are on order and will be installed when received. Life fire safety inspection partially complete, will be finaled after verification of exit discharge lighting install and fire apparatus access correction.
BLD-Framing/Rough-in2/24/20162/24/20162/24/2016PPASS
DetailsJim Storey
Phone #: ###-####
BLD-Other1/19/20161/19/20161/19/2016PDEFR
DetailsJim Storey
seepage bed; Ody Phone #: ###-#### public works insp.