Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD15-04377
StatusFinaled
Name STONE RIDGE HOMES
Site Address 2061 N BLAINE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Scope of work includes a residential addition to main floor of approximately 224 sq. ft. and 224 sq. ft. to the existing basement. A portion of the basement floor system will be removed and lowered to comply with head height requirements. Home will be brought up to code for basement stairs, and smoke and CO2 detectors. Electrical, plumbing and HVAC permits will be pulled separately. Work will be performed per the approved plans and local codes. **DAF**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/6/20165/9/20165/9/2016PPASS
DetailsTony Young
Call 30 minutes before // Ed Phone #: ###-####
DOC - Permit Finaled5/9/20165/9/20165/9/2016PPASS
DetailsTony Young
done
BLD-Energy code compliance3/2/20163/2/20163/2/2016PPASS
DetailsTony Young
Ed Phone #: ###-####
BLD-Framing/Rough-in2/25/20162/26/20162/26/2016PPASS
DetailsTony Young
Call half hour before // Ed Phone #: ###-####
BLD-Framing/Rough-in2/24/20162/25/20162/25/2016PPART
DetailsTony Young
Call half hour before // Ed Phone #: ###-####,, needs a mech permit and inspection.. verify seal package and fire blocking at energy,, ok to insulate
BLD-Conference2/8/20162/9/20162/9/2016APASS
DetailsTony Young
would like call ahead; Jenkins Phone #: ###-####,, ?s on design method,, ok pending architect
BLD-Final1/20/20161/20/20161/20/2016PCANC
DetailsTony Young
Wayne Phone #: ###-####
BLD-Footing1/11/20161/12/20161/12/2016APART
DetailsJim Sly
Annie Phone #: ###-####
Foundation wall....OK.
BLD-Footing1/7/20161/7/20161/7/2016PPASS
DetailsTony Young
Annie-pour time 2:00 Phone #: ###-####,, addition ok
BLD-Foundation12/29/201512/30/201512/30/2015APART
DetailsTony Young
would like call ahead; Annie Phone #: ###-####,, interior walls under existing ok,, ok to pour slab
BLD-Footing12/29/201512/29/201512/29/2015PPART
DetailsTony Young
would like call ahead; Annie Phone #: ###-####,, interior ftgs,, ok
BLD-Footing12/21/201512/21/201512/21/2015PPASS
DetailsMike Jordan
Annie-pour time 2:00 Phone #: ###-####// please call before