BLD-Final | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|
DOC - Permit Finaled | | | 7/18/2016 | | DONE |
|
|
|
|
BLD-Final | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | NR |
Phil Shearer
|
|
|
TI Final Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Ceiling Grid Inspection | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Phil Shearer
|
|
|
TI Final Phone #: ###-#### Inspection requested via web by Mike McHargue
|
FIRE-Final Inspection | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Hardware to the east room to be changed so that people are not directed to a locked door.
|
BLD-Energy code compliance | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | DEFR |
Mike Jordan
|
|
|
Shell Framing Inspection Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Mike Jordan
|
|
|
Exterior Wall Shear Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 4/21/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Mike Jordan
|
|
|
Roof Sheer and Straps Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Wall Bracing | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | FAIL |
Mike Jordan
|
|
|
Flat roof sheer nailing, hold downs, column anchor nuts Phone #: ###-#### Inspection requested via web by Mike McHargue. Roof nailing for diaphragm. Needs to renail, fasteners over spaced.
|
BLD-Concrete | 3/10/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Mike Jordan
|
|
|
Interior slab thick-end footings Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 3/3/2016 | 3/3/2016 | 3/3/2016 | P | PASS |
Mike Jordan
|
|
|
Foundation Insulation Early PM if possible Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 3/2/2016 | 3/3/2016 | 3/3/2016 | A | NR |
Mike Jordan
|
|
|
Foundation insulation inspection mid to late morning if possible Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Foundation | 2/29/2016 | 2/29/2016 | 2/29/2016 | P | PASS |
Mike Jordan
|
|
|
Stemwall rebar, late PM if possible Phone #: ###-#### Inspection requested via web by Mike McHargue. Perimeter stemwall and interior column pad footings ok.
|
BLD-Footing | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | PASS |
Mike Jordan
|
|
|
Footing rebar inspection, ready at 2PM Phone #: ###-#### Inspection requested via web by Mike McHargue. Permiter footings ok.
|
BLD-Conference | 2/25/2016 | 2/26/2016 | 2/26/2016 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|