Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD15-04541
StatusFinaled
Name DARRELL WICKHAM
Site Address 9140 W EMERALD ST STE Unit: 110
Project NameDrug Test of Idaho Suite 110
Customer NumberBLD15-04542
ePlanReviewNo
Description
(DRUG TEST OF IDAHO)**plan modification for mechanical changes** 2/26/16 ajs**Tenant improvement for build out of a vanilla finish created under BLD04-00676. Scope of work to include interior nonbearing partition walls to create 2 offices, storage and utility area, 3 restrooms, reception and waiting area. This tenant space only requires 1 ADA compliant restroom. The additional restrooms are added for the function of the business. New ceiling grid and lighting to be installed. Permits required for plumbing and mechanical and electrical work. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **AJS**

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/10/20165/11/20165/11/2016APASS
DetailsMike Jordan
Darrell/ please call 30 min prior Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection5/10/20165/11/20165/11/2016APASS
DetailsTroy Cobbley
Life safety passed
BLD-Ceiling Grid Inspection4/28/20164/28/20164/28/2016PPASS
DetailsMike Jordan
Call before // Darrell Phone #: ###-####
BLD-Framing/Rough-in3/25/20163/25/20163/25/2016PPASS
DetailsMike Jordan
would like a call two hours before you head out there // Darrell Phone #: ###-####. Received letter from architect stating that the indoor fancoil unit installed and supported by the roof truss system is acceptable. Will have letter scanned into case.
BLD-Framing/Rough-in3/4/20163/7/20163/7/2016ADONE
DetailsMike Jordan
would like call ahead; Darrell Phone #: ###-####
BLD-Framing/Rough-in3/4/20163/4/20163/4/2016PPASS
DetailsMike Jordan
Darrell Phone #: ###-####. Interior wood framed walls only. No grid. Stiil need engineering for HVAC support of floor joist.
BLD-Framing/Rough-in3/1/20163/2/20163/2/2016PFAIL
DetailsMike Jordan
would like call ahead; Darrell Phone #: ###-####. Foam all top plate penetrations in wood stud wall. Provide engineering to show that bottom chords of roof joist will support the suspended HVAC ubit.