Permit Information
Permit NumberBLD16-00172
StatusFinaled
Name VECTOR CONSTRUCTORS LLC
Site Address 918 W IDAHO ST
Project NameAthlos Headquarters - Phase 3
Customer Number 
ePlanReviewYes
Description
**Project Man - Ron Hill** (ATHLOS HEADQUARTERS – PHASE 3 – TENANT IMPROVEMENT) (DRH15-00410 AND DRH15-00444) The fire sprinkler system is used for building area increase, story increase, and for fire area. To remodel a 107,066 square foot existing building (23,570 square foot basement, 21,864 square foot 1st story, 7,272 square foot 1st story mezzanine, 944 square foot 1st story mechanical mezzanine, 22,242 square foot 2nd story, 23,095 square foot 3rd story, and 8,079 square foot 4th story) to be used for offices and as a training facility for a charter school. The seismic upgrade and other structural changes were done under permit BLD15-03621 (Phase 1). The streetscape, exterior wall finishes, shade awnings, canopies, windows, trellis, etc. were done under permit BLD16-00049 (Phase 2).
Basement: Work is to include an insulated 1-hr fire-resistance-rated ceiling, insulated interior nonbearing walls, a 1-hr stairway shaft enclosure, two parking spaces accessible to the disabled, and new openings in an existing interior concrete wall with steel angle headers and jambs to accommodate new louvers. Occupancies include an S-2 Occupancy parking garage (93 OL), a B Occupancy digital press room (3 OL), S-1 Occupancy storage rooms (4 OL), and mechanical rooms (7 OL).
1st story: Work is to include interior nonbearing walls, a Men’s shower/locker room with one shower accessible to the disabled, a Women’s shower/locker room with one shower accessible to the disabled, four multi-user toilet rooms, steps at the change of elevation at the alley, interior windows, interior doors, millwork, and interior finishes. An interior open stairway will be constructed from the 1st story to the 1st story mezzanine. Occupancies include an A-3 Occupancy sports field (103 OL), an A-3 Occupancy sports court (102 OL), an A-3 Occupancy break room (174 OL), a B Occupancy weight room (17 OL), an A-3 Occupancy lobby and circulation area (114 OL), S-1 Occupancy storage and mechanical rooms (3 OL), and B Occupancy locker rooms (14 OL).
1st story mezzanine: Work is to include a new 262 square foot floor system suspended from the floor above, a new open interior stairway to the 2nd story, glass guards, interior nonbearing walls, 2 multi-user restrooms accessible to the disabled, 1 single-user restroom accessible to the disabled, interior doors, interior windows, millwork, and finishes. Occupancies include a B Occupancy open office area (19 OL), B Occupancy classrooms (128 OL total), accessory I-4 Occupancy child care (20), B Occupancy massage room and IT room (3 OL), and S-1 Occupancy mechanical rooms (4 OL).
2nd story: Work is to include interior nonbearing walls, 2 multi-user restrooms accessible to the disabled, an interior set of steps and an interior ramp at the change of elevation at the pedestrian walkway that connects across the alley to a parking garage, interior doors, interior windows, glass guards, millwork, and finishes. Occupancies include B Occupancy offices (240 OL) and S-1 Occupancy mechanical rooms (1 OL).
3rd story: Work is to include interior nonbearing walls, 2 multi-user restrooms accessible to the disabled, and interior doors. Otherwise, the 3rd story is a shell space and will not be occupied under this permit. Using the 3rd story as a lease space may be problematic since an unobstructed means of egress from the 3rd story and an unobstructed vertical route accessible to the disabled to and from the 3rd story is required. Based on 1 person for every 100 square feet the occupant load would be 224 occupants.
4th story: Work is to include interior nonbearing walls, 2 multi-user restrooms accessible to the disabled, 2 private toilet/shower rooms adaptable to the disabled, interior doors, interior windows, millwork, exterior decks, and finishes. Occupancies include four B Occupancy roof decks (124 OL total), B Occupancy offices (64 OL), B Occupancy breakroom (13 OL), a B Occupancy conference room (20 OL), and S-1 mechanical rooms (1 OL). CJW
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/28/20176/29/20176/29/2017PPASS
DetailsDave Hannah
Please call ahead for access - Scott Phone #: ###-####
BLD-Final6/26/20176/27/20176/27/2017PPART
DetailsDave Hannah
Scott Phone #: ###-#### ok for temp occ
FIRE-Final Inspection6/27/20176/27/20176/27/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place by main entry, luminous egress path markings for stairwell number 2 to be installed. Final life fire safety inspection passed/complete.
Extend Permit 90/180 days6/27/20176/27/20176/27/2017PCANC
DetailsJim Page
BLD-Final6/22/20176/23/20176/23/2017PNR
DetailsMike Jordan
Scott Phone #: ###-####. Needs fire/life/safety, zoning and public works finals.
BLD-Conference5/10/20175/10/20175/11/2017PPASS
DetailsDave Hannah
Scott Phone #: ###-####
BLD-Framing/Rough-in4/7/20174/7/20174/10/2017PPASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Final3/29/20173/30/20173/31/2017PPART
DetailsDave Hannah
Building Final for Dave to verify safety railing is in-place at 2nd Floor Phone #: ###-#### Inspection requested via web by Joel Halfhill ok for temp occ of second and fourth floors
BLD-Final3/28/20173/29/20173/30/2017APEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Joel Halfhill
FIRE-Final Inspection3/27/20173/28/20173/28/2017APART
DetailsJim Page
Life fire safety Inspection for requested TCO complete (Levels 2 and 4). Building has active fire sprinklers throughout to include monitoring, final inspection for fire sprinklers in requested TCO area's with exception to some heads that will be installed at a later date, final fire alarm inspection has been completed for TCO requested area's (fire alarms are active on floors above and below TCO requested floors 2 and 4), fire extinguishers are in place with current inspection tags, knox box is on order and will be installed when received. Area's that have not had a final inspection performed are the basement level, level 1, mezzanine level and level 3. Life fire safety inspection passed for levels 2 and 4.
FIRE-Final Inspection3/27/20173/27/20173/27/2017ACANC
DetailsJim Page
FIRE-Final Inspection3/27/20173/27/20173/27/2017PCANC
DetailsJim Page
Inspection scheduled for 28MAR2017, this request is cancelled.
BLD-Other3/22/20173/23/20173/23/2017APEND
DetailsDave Hannah
We are requesting a conditional TCO for floors 2 and 4. If email response is used, please send to halfhilljoel@gmail.com.

Thank you Phone #: ###-#### Inspection requested via web by Joel Halfhill
BLD-Framing/Rough-in3/15/20173/15/20173/15/2017PPASS
DetailsDave Hannah
Joel Phone #: ###-####
BLD-Framing/Rough-in2/27/20172/28/20172/28/2017APART
DetailsDave Hannah
Joel Phone #: ###-#### landing ok to over
FIRE-Conference2/22/20172/22/20172/22/2017PDONE
DetailsKatie Marron
Phone conversation with Rochelle on required signage at stairwells/floor levels and fire protection equipment doors.
BLD-Framing/Rough-in2/13/20172/14/20172/14/2017APASS
DetailsDave Hannah
Partial, first floor - Joel Phone #: ###-####
BLD-Energy code compliance1/31/20172/1/20172/1/2017APASS
DetailsDave Hannah
Insulation // Joel Phone #: ###-#### first floor bottom of windows
BLD-Framing/Rough-in1/27/20171/30/20171/30/2017APASS
DetailsDave Hannah
Joel Phone #: ###-####
BLD-Framing/Rough-in1/23/20171/24/20171/24/2017APASS
DetailsDave Hannah
Joel Phone #: ###-####
BLD-Framing/Rough-in1/20/20171/23/20171/23/2017APASS
DetailsDave Hannah
Partial ceiling framing - Joel Phone #: ###-#### first floor rest rooms and second floor offices ok to cover
BLD-Framing/Rough-in1/17/20171/18/20171/18/2017APASS
DetailsDave Hannah
Dave Phone #: ###-####
BLD-Conference1/17/20171/18/20171/18/2017APASS
DetailsDave Hannah
Dave Phone #: ###-####
BLD-Conference1/3/20171/4/20171/4/2017APEND
DetailsDave Hannah
Joel Phone #: ###-#### ground level ceiling higth in rest rooms down to 7-3 becouse of beams
BLD-Framing/Rough-in12/22/201612/23/201612/23/2016APART
DetailsTony Young
Joel-Partial Phone #: ###-####-0155,, 2 beams on 2nd floor,, pending special inspection ,, mech room fire wall and walls in classroom,, as noted on plans,, ok to cover pending trades
BLD-Framing/Rough-in12/14/201612/15/201612/15/2016APASS
DetailsDave Hannah
joel Phone #: ###-#### mez framing ok
BLD-Framing/Rough-in12/8/201612/9/201612/12/2016APASS
DetailsDave Hannah
Joel Phone #: ###-####
BLD-Framing/Rough-in11/30/201611/30/201612/1/2016PPASS
DetailsDave Hannah
joel Phone #: ###-####
BLD-Framing/Rough-in11/23/201611/28/201611/28/2016APASS
DetailsDave Hannah
Joel Phone #: ###-####
BLD-Framing/Rough-in11/15/201611/16/201611/16/2016APASS
DetailsDave Hannah
joel Phone #: ###-####
BLD-Framing/Rough-in11/10/201611/10/201611/14/2016PPART
DetailsDave Hannah
Joel Phone #: ###-#### ok to one side 1st floor
BLD-Framing/Rough-in10/25/201610/26/201610/27/2016PPART
DetailsDave Hannah
Joel Phone #: ###-####
BLD-Framing/Rough-in10/12/201610/12/201610/12/2016PPASS
DetailsJim Storey
John Phone #: ###-#### ramp sheerok/ soffits 2 nd floor ok
BLD-Other10/4/201610/5/201610/5/2016APASS
DetailsDave Hannah
Scott// stairwell inspection Phone #: ###-####
BLD-Framing/Rough-in9/29/20169/30/20169/30/2016APART
DetailsDave Hannah
Joel Phone #: ###-#### stair one ok
BLD-Energy code compliance9/21/20169/22/20169/23/2016APART
DetailsDave Hannah
Joel Phone #: ###-#### basement ceiling and wall on ally side 2 thru 4
BLD-Energy code compliance9/20/20169/21/20169/21/2016APASS
DetailsDave Hannah
Joel Phone #: ###-####
BLD-Framing/Rough-in9/12/20169/12/20169/13/2016PPART
DetailsDave Hannah
Joel Phone #: ###-####
BLD-Framing/Rough-in8/23/20168/24/20168/30/2016PPASS
DetailsDave Hannah
Joel Phone #: ###-#### east end second floor
BLD-Energy code compliance8/24/20168/25/20168/26/2016PPART
DetailsDave Hannah
Joel Phone #: ###-#### east half second floor ok to cover
BLD-Energy code compliance8/17/20168/18/20168/18/2016APART
DetailsMike Jordan
David Phone #: ###-####. Ok to rock exterior walls(west and south west ends) 2nd. floor only. Contractor to send RFI for insulation between top of wall and bottom of 3rd. floor.
BLD-Framing/Rough-in8/16/20168/17/20168/17/2016APASS
DetailsMike Jordan
David Phone #: ###-####. 2nd floor, interior steel stud walls and furred walls, west end and south west portion only. Ok to insulate exterior furred walls.
BLD-Energy code compliance8/9/20168/10/20168/10/2016APART
DetailsDave Hannah
Joel Phone #: ###-#### ok to cover 4th floor
BLD-Framing/Rough-in8/4/20168/8/20168/8/2016APEND
DetailsDave Hannah
Joel 4th floor Phone #: ###-#### ok to insulate after other trades ok